石油钻采工艺
石油鑽採工藝
석유찬채공예
OIL DRILLING & PRODUCTION TECHNOLOGY
2014年
2期
68-71
,共4页
孙杰文%程维恒%吴志均%王鹏%邵昭媛
孫傑文%程維恆%吳誌均%王鵬%邵昭媛
손걸문%정유항%오지균%왕붕%소소원
阿姆河气田%酸性气井%分段完井%套管外封隔器%遇油膨胀
阿姆河氣田%痠性氣井%分段完井%套管外封隔器%遇油膨脹
아모하기전%산성기정%분단완정%투관외봉격기%우유팽창
Amu Darya%acidic gas well%segregated completion%external casing packer%swelling in oil
分段完井已逐渐成为水平井、大斜度井储层保护、控水及分段改造的主要手段。基于膨胀橡胶的遇油遇水膨胀封隔器是分段完井的关键工具。系统总结了此类封隔器的技术特征与应用特性,进行了胀封机理、影响因素研究,给出了胀封后主要技术指标及5种结构类型遇油膨胀封隔器的技术特点。研究结果表明,酸、碱、盐溶液对于已膨胀橡胶影响幅度小于10%,遇油膨胀封隔器具有结构简单、操作方便、坐封可靠、多次膨胀及永久膨胀等明显技术优势。阿姆河气田BP101D井是一口高温、高压、高含硫大斜度井,预测产量超过110×104 m3/d,底部完井工艺设计采用遇油膨胀封隔器与增产滑套为核心工具的永久分段完井管柱组合,储层的成功分段为后期的找堵水、定点有效控水、分段改造提供了技术窗口,为高产气井可持续高效采气提供了技术支持和保障。
分段完井已逐漸成為水平井、大斜度井儲層保護、控水及分段改造的主要手段。基于膨脹橡膠的遇油遇水膨脹封隔器是分段完井的關鍵工具。繫統總結瞭此類封隔器的技術特徵與應用特性,進行瞭脹封機理、影響因素研究,給齣瞭脹封後主要技術指標及5種結構類型遇油膨脹封隔器的技術特點。研究結果錶明,痠、堿、鹽溶液對于已膨脹橡膠影響幅度小于10%,遇油膨脹封隔器具有結構簡單、操作方便、坐封可靠、多次膨脹及永久膨脹等明顯技術優勢。阿姆河氣田BP101D井是一口高溫、高壓、高含硫大斜度井,預測產量超過110×104 m3/d,底部完井工藝設計採用遇油膨脹封隔器與增產滑套為覈心工具的永久分段完井管柱組閤,儲層的成功分段為後期的找堵水、定點有效控水、分段改造提供瞭技術窗口,為高產氣井可持續高效採氣提供瞭技術支持和保障。
분단완정이축점성위수평정、대사도정저층보호、공수급분단개조적주요수단。기우팽창상효적우유우수팽창봉격기시분단완정적관건공구。계통총결료차류봉격기적기술특정여응용특성,진행료창봉궤리、영향인소연구,급출료창봉후주요기술지표급5충결구류형우유팽창봉격기적기술특점。연구결과표명,산、감、염용액대우이팽창상효영향폭도소우10%,우유팽창봉격기구유결구간단、조작방편、좌봉가고、다차팽창급영구팽창등명현기술우세。아모하기전BP101D정시일구고온、고압、고함류대사도정,예측산량초과110×104 m3/d,저부완정공예설계채용우유팽창봉격기여증산활투위핵심공구적영구분단완정관주조합,저층적성공분단위후기적조도수、정점유효공수、분단개조제공료기술창구,위고산기정가지속고효채기제공료기술지지화보장。
The segregated completion technique has been the main method to protect the reservoir of highly-deviated/horizontal wells, control water and perform staged stimulation. The oil/water swelling packer which is based on swelling rubber is the key tool for segregated completion technology. This paper summarizes the technical and application feature systematically, studies the swelling seal-ing mechanism and inlfuence factors have been carried on research and providing the main technical indicators after packer swelling and technical features of ifve types of swelling packers. The results show that the inlfuence of acid, alkali and salt on the swelling rubber are less than 10%and the oil swelling packer has the outstanding technical advantages of easy operation, reliable setting, multi-expansion and permanent expansion. For the application in BP101D, a highly deviated/high temperature, high pressure, high sulfur well in Amu Darya Gas Field, it is predicted that the yield is more than 110×104 m3/d. The bottom well completion technology use permanently-seg-regated completion string which takes the oil swelling packer and sliding sleeve as core tools. The successful segmentation of reservoir provides a technical window for future water blocking, effective water control at ifxed point and staged stimulation, and the technical support and guarantee for continuous production of high-yield gas.