空分设备%液空管线%液位%流量%管径
空分設備%液空管線%液位%流量%管徑
공분설비%액공관선%액위%류량%관경
air separation plant%liquid-air tubes%liquid level%flowrate%diameter of pipe
马钢20000 m3/h空分设备在运行中,因未能投运贫氪氙塔,下塔液空液位高,设备运行工况影响较大,通过精馏塔液空管线技术改造,保证设备稳定运行。介绍20000 m3/h空分设备精馏塔液空管线存在问题,分析了原因,阐述技术改造具体措施及取得效果。
馬鋼20000 m3/h空分設備在運行中,因未能投運貧氪氙塔,下塔液空液位高,設備運行工況影響較大,通過精餾塔液空管線技術改造,保證設備穩定運行。介紹20000 m3/h空分設備精餾塔液空管線存在問題,分析瞭原因,闡述技術改造具體措施及取得效果。
마강20000 m3/h공분설비재운행중,인미능투운빈극선탑,하탑액공액위고,설비운행공황영향교대,통과정류탑액공관선기술개조,보증설비은정운행。개소20000 m3/h공분설비정류탑액공관선존재문제,분석료원인,천술기술개조구체조시급취득효과。
The operation of the 20000 m3/h air separation plant of Masteel was much affected by high liquid level of liquid-air in the lower tower due to lack of operation of lean Kr/Xe tower. Stable operation was ensured through technical transformation of liquid-air tubes of the rectification tower. Problems in the liquid-air tubes of the rectification tower of Mas-teel’s 20000 m3/h air separation plant are introduced, causes of the problems are analyzed and concrete measures in the technical transformation and their effects are also presented.