在沿空留巷实施过程中,为了观测两顺槽在本工作面留巷期间和二次采动影响期间的围岩活动规律,考察巷道围岩变形和充填体的变形,在沿空留巷过程中设置相应的测站,对围岩表面位移、围岩深部位移及围岩应力变化进行观测,以验证沿空留巷效果。
在沿空留巷實施過程中,為瞭觀測兩順槽在本工作麵留巷期間和二次採動影響期間的圍巖活動規律,攷察巷道圍巖變形和充填體的變形,在沿空留巷過程中設置相應的測站,對圍巖錶麵位移、圍巖深部位移及圍巖應力變化進行觀測,以驗證沿空留巷效果。
재연공류항실시과정중,위료관측량순조재본공작면류항기간화이차채동영향기간적위암활동규률,고찰항도위암변형화충전체적변형,재연공류항과정중설치상응적측참,대위암표면위이、위암심부위이급위암응력변화진행관측,이험증연공류항효과。
In the process of gob-side entry retaining implementation, in order to observe the surrounding rock activity law of two crossheading of gob-side entry retaining in the working face and during the secondary mining influence period, observe the deformation of roadway surrounding rock of roadway and obturator etc, we set the corresponding station in the process of gob-side entry retaining to observe the surface displacement and deep displacement of surrounding rock, and the stress variation of surrounding rock etc, in order to verify the effect of the gob-side entry retaining.