立交桥%满堂支架%门式支架%支撑方式
立交橋%滿堂支架%門式支架%支撐方式
입교교%만당지가%문식지가%지탱방식
overpass%full frame%gantry frame%support method
通过对郑州市京广路—沙口路快速通道施工中建设路立交桥箱梁支架施工方案的比较,结合工程具体情况,分析了常规施工方法的优缺点,最终提出了适于该工程特点的施工方案,在立交桥施工中采取满堂支架和门式支架相结合的支撑方式,顺利完成了立交桥的施工,取得了良好的施工效果。
通過對鄭州市京廣路—沙口路快速通道施工中建設路立交橋箱樑支架施工方案的比較,結閤工程具體情況,分析瞭常規施工方法的優缺點,最終提齣瞭適于該工程特點的施工方案,在立交橋施工中採取滿堂支架和門式支架相結閤的支撐方式,順利完成瞭立交橋的施工,取得瞭良好的施工效果。
통과대정주시경엄로—사구로쾌속통도시공중건설로입교교상량지가시공방안적비교,결합공정구체정황,분석료상규시공방법적우결점,최종제출료괄우해공정특점적시공방안,재입교교시공중채취만당지가화문식지가상결합적지탱방식,순리완성료입교교적시공,취득료량호적시공효과。
@@@@By the comparison of the construction programs for box girder frames in the Jianshe road overpass in Jingguang-Shakou expressway of Zhengzhou were researched in detail. According to the specific circumstances of the project,the advantage and disadvantage of traditional construction methods were analyzed. The construction scheme fit for the project was put forward. The support method of the combination of full frame and gantry frame was used in the construction of the overpass,which bring about a successful construction and reference for the similar projects.