为了实现一趟管柱对多个层位分别进行移位射孔、试油,或利用一趟管柱对同一层位进行二次射孔、试油,研究试验了一趟管柱分层射孔试油联作技术。该技术的核心是在射孔管柱上加装泄压装置、两级减震装置,并将二级起爆装置的起爆方式由原来的常规投棒机械点火改变为投棒电起爆;同时,采用射孔管柱与A PR全通径测试器串联并顺序下井的联作模式进行试油。将泄压装置和减震装置安装于射孔管柱,解决了射孔起爆时产生的高压和强烈震动对枪串二级起爆装置的冲击,电起爆的起爆形式使二次起爆更有保障。该联作技术在3口试验井进行了试验应用,施工均一次性成功,射孔发射率100%,试油结果与测井解释结果相符,油层投产顺利。现场试验表明,该技术简化了下井工具和井口装置,操作简便,可使井下作业及射孔成本降低27%;提高了分层测试的准确性,缩短了试油周期,试油成功率提高37%。
為瞭實現一趟管柱對多箇層位分彆進行移位射孔、試油,或利用一趟管柱對同一層位進行二次射孔、試油,研究試驗瞭一趟管柱分層射孔試油聯作技術。該技術的覈心是在射孔管柱上加裝洩壓裝置、兩級減震裝置,併將二級起爆裝置的起爆方式由原來的常規投棒機械點火改變為投棒電起爆;同時,採用射孔管柱與A PR全通徑測試器串聯併順序下井的聯作模式進行試油。將洩壓裝置和減震裝置安裝于射孔管柱,解決瞭射孔起爆時產生的高壓和彊烈震動對鎗串二級起爆裝置的遲擊,電起爆的起爆形式使二次起爆更有保障。該聯作技術在3口試驗井進行瞭試驗應用,施工均一次性成功,射孔髮射率100%,試油結果與測井解釋結果相符,油層投產順利。現場試驗錶明,該技術簡化瞭下井工具和井口裝置,操作簡便,可使井下作業及射孔成本降低27%;提高瞭分層測試的準確性,縮短瞭試油週期,試油成功率提高37%。
위료실현일쟁관주대다개층위분별진행이위사공、시유,혹이용일쟁관주대동일층위진행이차사공、시유,연구시험료일쟁관주분층사공시유련작기술。해기술적핵심시재사공관주상가장설압장치、량급감진장치,병장이급기폭장치적기폭방식유원래적상규투봉궤계점화개변위투봉전기폭;동시,채용사공관주여A PR전통경측시기천련병순서하정적련작모식진행시유。장설압장치화감진장치안장우사공관주,해결료사공기폭시산생적고압화강렬진동대창천이급기폭장치적충격,전기폭적기폭형식사이차기폭경유보장。해련작기술재3구시험정진행료시험응용,시공균일차성성공,사공발사솔100%,시유결과여측정해석결과상부,유층투산순리。현장시험표명,해기술간화료하정공구화정구장치,조작간편,가사정하작업급사공성본강저27%;제고료분층측시적준학성,축단료시유주기,시유성공솔제고37%。
In order to achieve perforation and formation testing at in multiple layers ,or to do perfora-tion and formation testing at in the same layer twice in one trip run ,a string combining layered perforation and formation testing functions has been developed .Its core idea is to add a pressure relief device ,two lev-els of shock absorbing device to the conventional perforation string ,and to change the secondary initiation method from conventional mechanical ignition to electric initiation .In addition ,the combined operation mode with perforating string connected inseries and APR full size tester was adopted .The pressure relief device and shock absorbing device in perforating string has solved the problem perforation at the exit of detonation pressure and strong vibration impact to secondary blasting gun string device and electric initia-tiong ensures blast reliabilitying .The application of the combined string in 3 wells was successful ,with per-forating emission rate of 100% ,and testing results were consistent with well logging interpretation ,then reservoir was brought into production .The application showed this technology with simplified downhole tools and wellhead unit ,could make field operation easier ,and lower the cost of downhole operation and perforation by 27% ;enhance the accuracy of layered formation test and shorten the testing cycle ,and im-prove success rate of formation testing by 37% .