WATER SCIENCES AND ENGINEERING TECHNOLOGY
2013年
3期
71-72,73
,共3页
高压旋喷%围堰防渗%龙口水利枢纽
高壓鏇噴%圍堰防滲%龍口水利樞紐
고압선분%위언방삼%룡구수리추뉴
high pressure jet grouting%seepage control of cofferdam%Longkou water control project
龙口水利枢纽是万家寨水利枢纽配套工程,位于黄河北干流托克托至龙口河段的尾部,是黄河治理开发规划中确定的梯级工程之一。围堰建成后,渗漏较为严重,经过高压旋喷处理,有效解决了围堰的渗漏问题。
龍口水利樞紐是萬傢寨水利樞紐配套工程,位于黃河北榦流託剋託至龍口河段的尾部,是黃河治理開髮規劃中確定的梯級工程之一。圍堰建成後,滲漏較為嚴重,經過高壓鏇噴處理,有效解決瞭圍堰的滲漏問題。
룡구수리추뉴시만가채수리추뉴배투공정,위우황하북간류탁극탁지룡구하단적미부,시황하치리개발규화중학정적제급공정지일。위언건성후,삼루교위엄중,경과고압선분처리,유효해결료위언적삼루문제。
Longkou hydro-junction is the auxiliary project of Wanjiazhai Water Control Project, the project is located in the tail of the Togtoh River to the Longkou River, the Togtoh is the Yellow River north mainstream, it is one of the cascade project in the Yellow River development planning. The leakage of cofferdam is serious after the completion, and treatment with the high pressure jet grouting, it effectively solve the problem of the cofferdam leakage.