水资源保护
水資源保護
수자원보호
WATER RESOURCES PROTECTION
2013年
4期
77-81
,共5页
胡晓波%吴红艳%葛小东%朱端卫%周文兵%程东升
鬍曉波%吳紅豔%葛小東%硃耑衛%週文兵%程東升
호효파%오홍염%갈소동%주단위%주문병%정동승
数据包络分析%废水治理%政策评估%效率分析
數據包絡分析%廢水治理%政策評估%效率分析
수거포락분석%폐수치리%정책평고%효솔분석
data envelopment analysis (DEA)%wastewater treatment%policy assessment%efficiency analysis
基于数据包络分析(DEA)模型,以废水处理设施年度运行费用、工业污染源废水治理完成投资和城市环境基础设施建设污水处理投资为投入指标,以工业用水重复利用量、工业废水COD去除量和城市污水处理厂处理量为产出指标,利用2003—2010年我国26个地区的面板数据对湖北省废水治理效率进行评估。结果表明:2010年该省废水治理相对总效率比2003年提高53%;3项产出不足值变化情况基本一致,且具有可同步、均衡提升的特点。马奎斯特全要素生产率指数(Malmquist TFP)计算结果显示湖北省废水治理效率变化指数累积值为1.529,远大于废水治理技术变化指数累计值0.929,表明该省废水治理绩效提升的主导因素是优化了废水治理投入产出配置。
基于數據包絡分析(DEA)模型,以廢水處理設施年度運行費用、工業汙染源廢水治理完成投資和城市環境基礎設施建設汙水處理投資為投入指標,以工業用水重複利用量、工業廢水COD去除量和城市汙水處理廠處理量為產齣指標,利用2003—2010年我國26箇地區的麵闆數據對湖北省廢水治理效率進行評估。結果錶明:2010年該省廢水治理相對總效率比2003年提高53%;3項產齣不足值變化情況基本一緻,且具有可同步、均衡提升的特點。馬奎斯特全要素生產率指數(Malmquist TFP)計算結果顯示湖北省廢水治理效率變化指數纍積值為1.529,遠大于廢水治理技術變化指數纍計值0.929,錶明該省廢水治理績效提升的主導因素是優化瞭廢水治理投入產齣配置。
기우수거포락분석(DEA)모형,이폐수처리설시년도운행비용、공업오염원폐수치리완성투자화성시배경기출설시건설오수처리투자위투입지표,이공업용수중복이용량、공업폐수COD거제량화성시오수처리엄처리량위산출지표,이용2003—2010년아국26개지구적면판수거대호북성폐수치리효솔진행평고。결과표명:2010년해성폐수치리상대총효솔비2003년제고53%;3항산출불족치변화정황기본일치,차구유가동보、균형제승적특점。마규사특전요소생산솔지수(Malmquist TFP)계산결과현시호북성폐수치리효솔변화지수루적치위1.529,원대우폐수치리기술변화지수루계치0.929,표명해성폐수치리적효제승적주도인소시우화료폐수치리투입산출배치。
The efficiency of wastewater treatment in Hubei Province , China was analyzed using the data envelopment analysis (DEA) model.The model’ s inputs included the annual expenditure for the operation of wastewater treatment equipment and the investment completed in pollution treatment of industrial wastewater and sewage treatment for urban environmental infrastructure construction , and its outputs included the quantity of industrial recycled water use, the amount of COD removed from industrial wastewater , and the quantity of wastewater treated in wastewater treatment plants .Panel data from 26 districts of China from 2003 to 2010 were employed.The results show that the CRS technical efficiency increased by 53%in 2010 compared with 2003.The deficiency of the three outputs varied consistently .The calculation result of the Malmquist TFP index shows that the cumulative value of the wastewater treatment efficiency change for Hubei Province was 1.529, which was much higher than the cumulative value of the technical change (0.929), indicating that the dominant factor in the improvement of the wastewater treatment efficiency was the optimized allocation of inputs and outputs .