电力需求侧管理
電力需求側管理
전력수구측관리
POWER DEMAND SIDE MANAGEMENT
2013年
4期
19-23
,共5页
凝结水泵%高压变频器%节能降耗
凝結水泵%高壓變頻器%節能降耗
응결수빙%고압변빈기%절능강모
condensate pump%high voltage inverter%energy conservation and consumption reduction
介绍深圳妈湾电厂5、6号机组凝结水泵变频改造方案,阐述了高压变频器的安装调试情况及其控制策略,运行结果显示变频改造后电动机节能效果显著。
介紹深圳媽灣電廠5、6號機組凝結水泵變頻改造方案,闡述瞭高壓變頻器的安裝調試情況及其控製策略,運行結果顯示變頻改造後電動機節能效果顯著。
개소심수마만전엄5、6호궤조응결수빙변빈개조방안,천술료고압변빈기적안장조시정황급기공제책략,운행결과현시변빈개조후전동궤절능효과현저。
The article introduces frequency conversion recon-struction scheme of condensate pump for Shenzhen Mawan power plant unit 5, and 6.This paper expounds the installation and debug-ging situation of high voltage frequency converter and its control strategy. Operation results show that the frequency conversion re-construction after motor energy saving effect is remarkable, and im-prove the motor operating conditions.