针对焦煤集团九里山矿地质条件复杂、顶板压力大、支护困难等特点。基于高产高效、安全保障、机电完好等方面的要求,结合14102综采工作面在安装过程中遇到的问题进行总结分析,为综采工作面快速搬家提供借鉴经验。
針對焦煤集糰九裏山礦地質條件複雜、頂闆壓力大、支護睏難等特點。基于高產高效、安全保障、機電完好等方麵的要求,結閤14102綜採工作麵在安裝過程中遇到的問題進行總結分析,為綜採工作麵快速搬傢提供藉鑒經驗。
침대초매집단구리산광지질조건복잡、정판압력대、지호곤난등특점。기우고산고효、안전보장、궤전완호등방면적요구,결합14102종채공작면재안장과정중우도적문제진행총결분석,위종채공작면쾌속반가제공차감경험。
according to the characteristics of coking coal group nine mountain mine complex geological conditions,the roof pressure,supporting difficulty.High yield and high efficiency,safety,electrical and mechanical integrity and other require-ments based on the summary and analysis,combined with the 14102fully mechanized coal face encountered problems during the installation,providing a reference for fully mechanized working face moving fast.