满堂脚手架%安装工艺%空间尺寸%焊接变形
滿堂腳手架%安裝工藝%空間呎吋%銲接變形
만당각수가%안장공예%공간척촌%한접변형
通过工程实例介绍了营口奥林匹克中心体育场斜拉式混合体系焊接球网壳的安装方法比选,提出了该项目的施工难点,阐述了构件加工精度、网壳安装工艺和焊接变形控制等施工控制要点,保证了实施过程中网壳空间尺寸的安装精度,取得了较好的效果。
通過工程實例介紹瞭營口奧林匹剋中心體育場斜拉式混閤體繫銲接毬網殼的安裝方法比選,提齣瞭該項目的施工難點,闡述瞭構件加工精度、網殼安裝工藝和銲接變形控製等施工控製要點,保證瞭實施過程中網殼空間呎吋的安裝精度,取得瞭較好的效果。
통과공정실례개소료영구오림필극중심체육장사랍식혼합체계한접구망각적안장방법비선,제출료해항목적시공난점,천술료구건가공정도、망각안장공예화한접변형공제등시공공제요점,보증료실시과정중망각공간척촌적안장정도,취득료교호적효과。
By engineering example, the welded spherical reticulated shel of Yingkou Olympic Center Stadium cable-stayed hybrid system instal ation method selection are introduced in this paper,the building dif iculties of this project are put forward, the components proces ing precision, shel instal ation proces and control of welding deformation control points of building are expounded, the practice shows that this method ensures the instal ation precision of the shel space size during implementation proces , which achieved good results.