石油钻采工艺
石油鑽採工藝
석유찬채공예
OIL DRILLING & PRODUCTION TECHNOLOGY
2014年
3期
33-38
,共6页
程仲%牟小军%张俊斌%张亮%黄小龙%程昆
程仲%牟小軍%張俊斌%張亮%黃小龍%程昆
정중%모소군%장준빈%장량%황소룡%정곤
深水完井%半潜式平台%设计施工%水合物%圈闭压力%水下采油树安装
深水完井%半潛式平檯%設計施工%水閤物%圈閉壓力%水下採油樹安裝
심수완정%반잠식평태%설계시공%수합물%권폐압력%수하채유수안장
deep-water completion%semi-submersible platform%design and operation%hydrate,trap pressure%subsea tree installa-tion
南海东部海域某深水气田应用第六代半潜式深水钻井平台West Hercules和HYSY981平台顺利完成了9口井的完井作业,平均单井作业时间为41.03 d。在介绍该气田深水完井技术工艺特点、分析完井生产管柱设计原理的基础上,结合该气田的井况及环境特点,对深水完井作业难点及施工措施进行了系统的梳理,形成了一套完善的深水完井作业技术,包括材料防腐、水合物的防治、环空圈闭压力管理、生产管柱优化设计、压裂充填作业、井筒连续清洁、水下采油树安装和更换、复杂情况应急处理、精细施工等。清井放喷测试以及投产前的功能测试表明,各井产量及完井设备工作状态均达到投产要求。该套技术可以为今后其他深水油气田完井设计和施工提供借鉴。
南海東部海域某深水氣田應用第六代半潛式深水鑽井平檯West Hercules和HYSY981平檯順利完成瞭9口井的完井作業,平均單井作業時間為41.03 d。在介紹該氣田深水完井技術工藝特點、分析完井生產管柱設計原理的基礎上,結閤該氣田的井況及環境特點,對深水完井作業難點及施工措施進行瞭繫統的梳理,形成瞭一套完善的深水完井作業技術,包括材料防腐、水閤物的防治、環空圈閉壓力管理、生產管柱優化設計、壓裂充填作業、井筒連續清潔、水下採油樹安裝和更換、複雜情況應急處理、精細施工等。清井放噴測試以及投產前的功能測試錶明,各井產量及完井設備工作狀態均達到投產要求。該套技術可以為今後其他深水油氣田完井設計和施工提供藉鑒。
남해동부해역모심수기전응용제륙대반잠식심수찬정평태West Hercules화HYSY981평태순리완성료9구정적완정작업,평균단정작업시간위41.03 d。재개소해기전심수완정기술공예특점、분석완정생산관주설계원리적기출상,결합해기전적정황급배경특점,대심수완정작업난점급시공조시진행료계통적소리,형성료일투완선적심수완정작업기술,포괄재료방부、수합물적방치、배공권폐압력관리、생산관주우화설계、압렬충전작업、정통련속청길、수하채유수안장화경환、복잡정황응급처리、정세시공등。청정방분측시이급투산전적공능측시표명,각정산량급완정설비공작상태균체도투산요구。해투기술가이위금후기타심수유기전완정설계화시공제공차감。
In a deep-water gas ifeld in the eastern South China Sea, the sixth generation semi-submersible deep water drilling plat-forms West Hercules and HYSY981 were successfully applied for completion of nine wells, with average single-well operating cycle of 41.03 d. This paper describes the characteristics of deep-water completion technology and analyzes design principle of well completion string. Combining with the well conditions and characteristics of the environment, it also summarizes the dififculties and solutions in deep-water well completion operation. Finally, a set of perfect deep-well completion technology is formed, including material corro-sion, hydrate prevention, annulus trap pressure management, production string design optimization, frac-packing, continuous wellbore cleaning, subsea tree installation and replacement, emergency response in complex condition, and ifne operation. The lfowing well test and function test before well production show that the well production and the performance of completion equipment meet the well production requirements. This technology could provide a good reference for completion design and operation in other deep-water oil and gas ifelds in the future.