盐锅峡水电站非常溢洪道多年未进行大修,底板混凝土局部破损严重,2013年汛前对其进行了补强处理。在处理过程中,根据非常溢洪道底板混凝土破坏的机理,采取了有针对性的施工方案,严格控制施工质量,达到了预期目标。
鹽鍋峽水電站非常溢洪道多年未進行大脩,底闆混凝土跼部破損嚴重,2013年汛前對其進行瞭補彊處理。在處理過程中,根據非常溢洪道底闆混凝土破壞的機理,採取瞭有針對性的施工方案,嚴格控製施工質量,達到瞭預期目標。
염과협수전참비상일홍도다년미진행대수,저판혼응토국부파손엄중,2013년신전대기진행료보강처리。재처리과정중,근거비상일홍도저판혼응토파배적궤리,채취료유침대성적시공방안,엄격공제시공질량,체도료예기목표。
As the concrete of the bottom plate of emergency spillway at Yanguoxia hydropower station was damaged badly, repair was carried out before flood season in 2013. In treatment, effective measures were adopted and construction quality was strictly controlled which guaranteed the desired good effect.