广州地铁A3型车长期存在由于网络控制系统VTCU与DXB模块通讯超时导致的单元车主断跳开。为解决该问题,通过对控制系统软件逻辑分析、超时情况测试,制定了解决方案。解决了长期困扰车辆运行的问题。
廣州地鐵A3型車長期存在由于網絡控製繫統VTCU與DXB模塊通訊超時導緻的單元車主斷跳開。為解決該問題,通過對控製繫統軟件邏輯分析、超時情況測試,製定瞭解決方案。解決瞭長期睏擾車輛運行的問題。
엄주지철A3형차장기존재유우망락공제계통VTCU여DXB모괴통신초시도치적단원차주단도개。위해결해문제,통과대공제계통연건라집분석、초시정황측시,제정료해결방안。해결료장기곤우차량운행적문제。
Guangzhou Metro’ s A3 type car has a long-standing problem that unit car’ s main high-speed circuit breaker automatically disconnects which is lead by the overtime of communication between network control system VTCU and DXB module. To solve the problems mentioned above, have made the solution through a logic analysis of the control system software and repeated tests of timeout condition. Thus the long-term problem plaguing the vehicle running is solved.