高速铁路%桥梁%空心墩%施工技术
高速鐵路%橋樑%空心墩%施工技術
고속철로%교량%공심돈%시공기술
high-speed rail%bridge%hollow pier%construction technology
从薄壁高空心桥墩施工准备、测量定位、模板、钢筋、砼施工和支架搭设等方面入手,以宝象河特大桥空心墩施工工程为例,提出了薄壁高空心桥墩从施工准备到翻模施工混凝土浇筑、养护中需要注意的事项和施工的重点,对今后类似高桥墩工程的施工提供参考。
從薄壁高空心橋墩施工準備、測量定位、模闆、鋼觔、砼施工和支架搭設等方麵入手,以寶象河特大橋空心墩施工工程為例,提齣瞭薄壁高空心橋墩從施工準備到翻模施工混凝土澆築、養護中需要註意的事項和施工的重點,對今後類似高橋墩工程的施工提供參攷。
종박벽고공심교돈시공준비、측량정위、모판、강근、동시공화지가탑설등방면입수,이보상하특대교공심돈시공공정위례,제출료박벽고공심교돈종시공준비도번모시공혼응토요축、양호중수요주의적사항화시공적중점,대금후유사고교돈공정적시공제공삼고。
Heart pier construction preparation from thin-walled high-altitude measurements positioning, templates, steel, concrete construction, and other aspects Scaffording to Baoxianghe Hollow Bridge pier construction projects, for example, made from thin-walled high-altitude heart pier construction preparation to turning formwork concrete pouring, conservation needs to pay attention and focus on the construction of high pier construction of similar projects in the future to provide a reference.