城市建筑
城市建築
성시건축
URBANISM AND ARCHITECTURE
2014年
14期
347-347,358
,共2页
大直径%桩基%施工探索
大直徑%樁基%施工探索
대직경%장기%시공탐색
large diameter%pile foundation%explore the const-ruction
本工程的桩基础遇到起伏完整性的硬质基岩,进尺效率低、多次发生冲锤破坏。经对成孔工艺及冲锤设计等的探索改进,比较系统地解决了困难,为类似地质施工提供了实践依据和施工经验。
本工程的樁基礎遇到起伏完整性的硬質基巖,進呎效率低、多次髮生遲錘破壞。經對成孔工藝及遲錘設計等的探索改進,比較繫統地解決瞭睏難,為類似地質施工提供瞭實踐依據和施工經驗。
본공정적장기출우도기복완정성적경질기암,진척효솔저、다차발생충추파배。경대성공공예급충추설계등적탐색개진,비교계통지해결료곤난,위유사지질시공제공료실천의거화시공경험。
When pile foundation encounters the ups and do-wns integrity hard rock, it badly affects the efficiency of making hole and has an impact on RAM frequently. This paper systematical y solves the difficulties using improved techniq-ues of dril bore and new design of RAM. It may provide pr-actical base and construction experience for the similar ge-ological construction.