工程索赔%程序%合理化
工程索賠%程序%閤理化
공정색배%정서%합이화
engineering claim%procedure%reasonability
简要介绍了工程索赔的含义,阐述了工程索赔意向通知书包括的内容,并对索赔文件的编写、提交、审核及期限进行了归纳总结,提出了反索赔的方法,为今后工程索赔的合理化运用提供了参考借鉴。
簡要介紹瞭工程索賠的含義,闡述瞭工程索賠意嚮通知書包括的內容,併對索賠文件的編寫、提交、審覈及期限進行瞭歸納總結,提齣瞭反索賠的方法,為今後工程索賠的閤理化運用提供瞭參攷藉鑒。
간요개소료공정색배적함의,천술료공정색배의향통지서포괄적내용,병대색배문건적편사、제교、심핵급기한진행료귀납총결,제출료반색배적방법,위금후공정색배적합이화운용제공료삼고차감。
The paper briefly introduces the concept of the engineering claims,illustrates the contents of the notice of intention of engineering claims,sums up the compilation,the submission,the checking,and the deadline of the claim documents,and points out the anti-claim meth-ods,so as to provide some reference for the reasonable application of the engineering claims.