污水处理%A2/O%水质
汙水處理%A2/O%水質
오수처리%A2/O%수질
sewage treatment%A2/O%water quality
根据工程的设计进出水水质特点,确定最终的污水处理主体工艺为A2/O工艺,分析并结合设计条件,解决了在设计中遇到的问题,结合污水处理厂的进水条件和受纳水体的常水位及防洪水位,确定了该工程需要在厂区内设置一次提升。
根據工程的設計進齣水水質特點,確定最終的汙水處理主體工藝為A2/O工藝,分析併結閤設計條件,解決瞭在設計中遇到的問題,結閤汙水處理廠的進水條件和受納水體的常水位及防洪水位,確定瞭該工程需要在廠區內設置一次提升。
근거공정적설계진출수수질특점,학정최종적오수처리주체공예위A2/O공예,분석병결합설계조건,해결료재설계중우도적문제,결합오수처리엄적진수조건화수납수체적상수위급방홍수위,학정료해공정수요재엄구내설치일차제승。
According to the inlet and outlet water quality characteristics of engineering design,the final main sewage treatment process for A2/O process is determined. The problems encountered in the design are solved according to the analysis of design conditions. According to the sewage treatment plant influent condition,the normal water level and flood control level of receiving water,it needs to set a promotion inside the factory.