广东水利水电
廣東水利水電
엄동수이수전
GUANGDONG WATER RESOURCES AND HYDROPOWER
2014年
7期
19-23
,共5页
核电站%循环水%虹吸出水设计%泡沫治理
覈電站%循環水%虹吸齣水設計%泡沫治理
핵전참%순배수%홍흡출수설계%포말치리
nuclear power station%circulating water%siphon outlet design%elimination to foam
滨海核电站循环水采用淹没式虹吸管双重出流设计,在保证CC虹吸井合理水位控制基础上,对压力主流道、无压辅助流道及排水暗涵处采取了消能、减泡、拦泡、消涡等措施,并结合外海拦截和化学加药消泡系统,从而使CC出水不仅满足凝汽器真空度要求而且解决了排水泡沫问题。
濱海覈電站循環水採用淹沒式虹吸管雙重齣流設計,在保證CC虹吸井閤理水位控製基礎上,對壓力主流道、無壓輔助流道及排水暗涵處採取瞭消能、減泡、攔泡、消渦等措施,併結閤外海攔截和化學加藥消泡繫統,從而使CC齣水不僅滿足凝汽器真空度要求而且解決瞭排水泡沫問題。
빈해핵전참순배수채용엄몰식홍흡관쌍중출류설계,재보증CC홍흡정합리수위공제기출상,대압력주류도、무압보조류도급배수암함처채취료소능、감포、란포、소와등조시,병결합외해란절화화학가약소포계통,종이사CC출수불부만족응기기진공도요구이차해결료배수포말문제。
The submerged siphon double flow has been adopted in nuclear power station at the side of sea , which ensured the water level in CC well under control to maintain the appropriate vacuum degree of condenser .The measurements have been taken to elimi-nate the foam in the main flow with pressure and auxiliary flow as well as buried drainage culvert , such as the energy dissipation , bubble blockage , bubble elimination and burble deceasing .The above measurements in combination with chemical reagent addition and obstruction meshwork in sea successfully solved the CC foam problem .