给水排水
給水排水
급수배수
2014年
10期
49-53
,共5页
许明%涂勇%陆嘉昂%刘伟京%喻学敏%吴海锁%邹敏%李京
許明%塗勇%陸嘉昂%劉偉京%喻學敏%吳海鎖%鄒敏%李京
허명%도용%륙가앙%류위경%유학민%오해쇄%추민%리경
印染废水%高效净化%折流式厌氧水解%A/O(PACT)
印染廢水%高效淨化%摺流式厭氧水解%A/O(PACT)
인염폐수%고효정화%절류식염양수해%A/O(PACT)
Printing and dyeing wastewater%High-efficient treatment%Baffled anaerobic hydrol-ysis%A/O(PACT)
针对印染废水水质水量变化大、可生化性差、COD和色度去除不稳定和脱氮效率低等问题,采用高效厌氧处理、生物强化处理以及深度处理技术路线,开发了折流式厌氧水解(A B R水解)A/O(PACT )深度处理工艺,建立了中试研究基地和示范工程,根据处理规模为2万m3/d的示范工程处理效果,出水COD、总氮、氨氮、总磷和色度去除率分别为90.9%、78.5%、89.2%、92.2%和91.4%,出水水质可稳定达到《太湖地区城镇污水处理厂及重点工业行业主要水污染物排放限值》(DB 32/10722007),工程投资为1650元/m3,直接运行费用1.7元/m3。
針對印染廢水水質水量變化大、可生化性差、COD和色度去除不穩定和脫氮效率低等問題,採用高效厭氧處理、生物彊化處理以及深度處理技術路線,開髮瞭摺流式厭氧水解(A B R水解)A/O(PACT )深度處理工藝,建立瞭中試研究基地和示範工程,根據處理規模為2萬m3/d的示範工程處理效果,齣水COD、總氮、氨氮、總燐和色度去除率分彆為90.9%、78.5%、89.2%、92.2%和91.4%,齣水水質可穩定達到《太湖地區城鎮汙水處理廠及重點工業行業主要水汙染物排放限值》(DB 32/10722007),工程投資為1650元/m3,直接運行費用1.7元/m3。
침대인염폐수수질수량변화대、가생화성차、COD화색도거제불은정화탈담효솔저등문제,채용고효염양처리、생물강화처리이급심도처리기술로선,개발료절류식염양수해(A B R수해)A/O(PACT )심도처리공예,건립료중시연구기지화시범공정,근거처리규모위2만m3/d적시범공정처리효과,출수COD、총담、안담、총린화색도거제솔분별위90.9%、78.5%、89.2%、92.2%화91.4%,출수수질가은정체도《태호지구성진오수처리엄급중점공업행업주요수오염물배방한치》(DB 32/10722007),공정투자위1650원/m3,직접운행비용1.7원/m3。
Based on the rapid change of water quality ,poor biodegradability ,unstable remova-bility of COD and chroma ,and low nitrogen removability in printing and dyeing wastewater ,the high-efficiency anaerobic treatment ,enhanced biological treatment and advanced wastewater treat-ment technical routine were used in this study .The baffled anaerobic hydrolysis reactor (ABR hy-drolysis)-A/O (PACT )-advanced wastewater treatment process was developed and the pilot re-search basement and demonstration project were also set up .The operation results of a demonstra-tion project with 20 000 m3/d showed that the removal rates of COD ,total nitrogen ,ammonia ni-trogen ,total phosphorus and chroma were 90 .9% 、78 .5% 、89 .2% 、92 .2% ,and 91 .4% ,respec-tively .The quality of effluent could meet the requirements of Discharge standard of main water pollutants for municipal wastewater treatment plant & key industries of Taihu area (DB32/1072-2007) .The project investment was 1 650 Yuan/m3 ,the direct operation cost was 1 .7 Yuan/m3 .