南水北调与水利科技
南水北調與水利科技
남수북조여수리과기
SOUTH-TO-NORTH WATER
2014年
3期
205-208
,共4页
奚建猛%孙业文%龚志明%wen%GONG Zhi%ming
奚建猛%孫業文%龔誌明%wen%GONG Zhi%ming
해건맹%손업문%공지명%wen%GONG Zhi%ming
陶岔渠首%渗控处理%帷幕灌浆%深厚覆盖层
陶岔渠首%滲控處理%帷幕灌漿%深厚覆蓋層
도차거수%삼공처리%유막관장%심후복개층
T-aocha-Canal-Headwork%seepage-control-treatment%curtain-grouting%deep-overburden-layer
丹江口水库高水位运行时,其副坝)陶岔渠首枢纽工程存在坝基渗漏及绕坝渗漏问题,需对坝基及坝两岸地基进行渗控处理。通过现场帷幕灌浆试验,根据工程特点制订了合理的地基渗控处理设计和施工方案,最终解决了深厚覆盖层钻进成孔、灌浆孔口管埋设以及土岩接触面灌浆、深厚覆盖层下岩溶强透水岩体灌浆成幕等难题。地基渗控处理完成后进行了工程质量检测和安全监测,结果表明陶岔渠首枢纽工程地基渗控处理满足设计要求,达到预期效果。该工程现场帷幕灌浆试验方法和帷幕灌浆设计、施工方案,可为类似的深厚覆盖层渗控处理问题提供参考。
丹江口水庫高水位運行時,其副壩)陶岔渠首樞紐工程存在壩基滲漏及繞壩滲漏問題,需對壩基及壩兩岸地基進行滲控處理。通過現場帷幕灌漿試驗,根據工程特點製訂瞭閤理的地基滲控處理設計和施工方案,最終解決瞭深厚覆蓋層鑽進成孔、灌漿孔口管埋設以及土巖接觸麵灌漿、深厚覆蓋層下巖溶彊透水巖體灌漿成幕等難題。地基滲控處理完成後進行瞭工程質量檢測和安全鑑測,結果錶明陶岔渠首樞紐工程地基滲控處理滿足設計要求,達到預期效果。該工程現場帷幕灌漿試驗方法和帷幕灌漿設計、施工方案,可為類似的深厚覆蓋層滲控處理問題提供參攷。
단강구수고고수위운행시,기부패)도차거수추뉴공정존재패기삼루급요패삼루문제,수대패기급패량안지기진행삼공처리。통과현장유막관장시험,근거공정특점제정료합리적지기삼공처리설계화시공방안,최종해결료심후복개층찬진성공、관장공구관매설이급토암접촉면관장、심후복개층하암용강투수암체관장성막등난제。지기삼공처리완성후진행료공정질량검측화안전감측,결과표명도차거수추뉴공정지기삼공처리만족설계요구,체도예기효과。해공정현장유막관장시험방법화유막관장설계、시공방안,가위유사적심후복개층삼공처리문제제공삼고。
When the water level is high in the Danjiangkou Reservoir, the following problems occur in its accessory dam - the pivotal project of Taocha Canal H eadw ork, such as seepage in the dam base and around the dam, therefore the seepage control treatment needs to be conducted to the dam base and dam foundation. Based on the field curtain grouting experiment and the project characteristics, a reasonable seepage control treatment design and construction scheme for dam base w as proposed, w hich can solve the follow ing problems including drilling holes in deep overburden layers, burying and covering up grout nipple, grou2 ting at the contact face between the land and rock,and curtain grouting to thehighly permeablekarst rock mass under thedeep overburdenlayers.Afterthecompletionoftheseepagecontroltreatmentfordambase,thequalityandsafetyoftheprojectwere investigated, and the results showed that the seepage control treatment for dam base in the pivotal project of Taocha Canal Headwork meets the design requirements and achieves the desired results. The field curtain grouting experiment method, and design and construction scheme can provide reference for solving similar problems of seepage control of deep overburden layers.