铁道科学与工程学报
鐵道科學與工程學報
철도과학여공정학보
JOURNAL OF RAILWAY SCIENCE AND ENGINEERING
2014年
3期
71-76
,共6页
曹兆虎%孔纲强%周航%孙学谨
曹兆虎%孔綱彊%週航%孫學謹
조조호%공강강%주항%손학근
扩底楔形桩%拔桩过程%模型试验%位移场%透明土%PIV技术
擴底楔形樁%拔樁過程%模型試驗%位移場%透明土%PIV技術
확저설형장%발장과정%모형시험%위이장%투명토%PIV기술
belled wedge pile%pile pulling process%model test%displacement field%transparent soil%PIV tech-nology
随着地下空间的逐步开发,既有桩基拔除问题及其拔桩过程对周围构件物影响的问题日渐突出;针对拔桩过程中桩对周围土体的位移场及影响范围的研究相对较少,而针对异形桩的研究更少。基于透明土材料和PIV(Particle Image Ve-locimetry)技术,开展扩底楔形桩的拔桩过程模型试验,测得拔桩过程中桩周土体的位移场变化规律以及拔桩影响范围;同时进行等直径圆形桩和楔形桩的拔桩模型试验并对比分析。研究结果表明:扩底楔形桩的拔桩扰动范围明显比楔形桩和等直径圆形桩大,其数值接近等直径圆形桩的2.0倍;楔形桩拔桩过程中水平向位移扰动比等直径圆形桩大,竖向位移扰动比等直径圆形桩小。
隨著地下空間的逐步開髮,既有樁基拔除問題及其拔樁過程對週圍構件物影響的問題日漸突齣;針對拔樁過程中樁對週圍土體的位移場及影響範圍的研究相對較少,而針對異形樁的研究更少。基于透明土材料和PIV(Particle Image Ve-locimetry)技術,開展擴底楔形樁的拔樁過程模型試驗,測得拔樁過程中樁週土體的位移場變化規律以及拔樁影響範圍;同時進行等直徑圓形樁和楔形樁的拔樁模型試驗併對比分析。研究結果錶明:擴底楔形樁的拔樁擾動範圍明顯比楔形樁和等直徑圓形樁大,其數值接近等直徑圓形樁的2.0倍;楔形樁拔樁過程中水平嚮位移擾動比等直徑圓形樁大,豎嚮位移擾動比等直徑圓形樁小。
수착지하공간적축보개발,기유장기발제문제급기발장과정대주위구건물영향적문제일점돌출;침대발장과정중장대주위토체적위이장급영향범위적연구상대교소,이침대이형장적연구경소。기우투명토재료화PIV(Particle Image Ve-locimetry)기술,개전확저설형장적발장과정모형시험,측득발장과정중장주토체적위이장변화규률이급발장영향범위;동시진행등직경원형장화설형장적발장모형시험병대비분석。연구결과표명:확저설형장적발장우동범위명현비설형장화등직경원형장대,기수치접근등직경원형장적2.0배;설형장발장과정중수평향위이우동비등직경원형장대,수향위이우동비등직경원형장소。
With the development of underground space,pulling out problems of the existing pile and its impact areas become more and more prominent.However,the researches focused on displacement field and impact areas of pile pulling out process were relatively little,not to mention the study about profiled pile.Base on transparent soil material and PIV (Particle Image Velocimetry)technique,experiment on pulling process of the belled wedge pile was carried out,and the displacement field of the pile surrounding soil,and impact areas during pile pulling out process were non-intrusively measured.In order to conduct comparative analysis,experiment on the equal cross-section pile and the tapered pile with the same concrete usage was also taken.The research results show that the impact areas of belled wedge pile are obviously larger than those of equal section piles and tapered piles, of which the value is nearly 2.0 times of those of equal section piles.In the process of pulling out belled wedge piles,the horizontal displacement of the tapered pile is larger than that of the equal section pile,while the verti-cal displacement of the tapered pile is smaller than that of the equal section pile.