中国国土资源经济
中國國土資源經濟
중국국토자원경제
NATURAL RESOURSE ECONOMICS OF CHINA
2014年
6期
37-41,55
,共6页
邵旭升%李正%李飞%冯军江
邵旭升%李正%李飛%馮軍江
소욱승%리정%리비%풍군강
土地复垦%现状%问题%对策建议%新疆
土地複墾%現狀%問題%對策建議%新疆
토지복은%현상%문제%대책건의%신강
land reclamation%the status quo%problem%countermeasures and suggestions%Xinjiang
目前新疆土地复垦工作取得一定的成绩,但仍然存在部分地方政府及项目单位重视不够、职能部门管理能力不强、新法律法规宣传贯彻滞后、相关配套措施不健全、部门之间不够协调、监管力度不够等问题,严重影响了土地复垦工作的有序推进。建议从六个方面推进土地复垦工作:(1)加快健全土地复垦管理机构,加强土地复垦配套政策制度研究;(2)完善土地复垦激励措施,促进复垦资金渠道多元化;(3)加强土地复垦管理队伍建设,强化方案编制单位及人员管理;(4)加快土地复垦监测监管信息化建设和系统研发;(5)加快开展历史遗留和自然灾害损毁土地复垦调查评价工作;(6)理顺土地复垦方案和矿山地质环境保护与治理恢复方案关系。
目前新疆土地複墾工作取得一定的成績,但仍然存在部分地方政府及項目單位重視不夠、職能部門管理能力不彊、新法律法規宣傳貫徹滯後、相關配套措施不健全、部門之間不夠協調、鑑管力度不夠等問題,嚴重影響瞭土地複墾工作的有序推進。建議從六箇方麵推進土地複墾工作:(1)加快健全土地複墾管理機構,加彊土地複墾配套政策製度研究;(2)完善土地複墾激勵措施,促進複墾資金渠道多元化;(3)加彊土地複墾管理隊伍建設,彊化方案編製單位及人員管理;(4)加快土地複墾鑑測鑑管信息化建設和繫統研髮;(5)加快開展歷史遺留和自然災害損燬土地複墾調查評價工作;(6)理順土地複墾方案和礦山地質環境保護與治理恢複方案關繫。
목전신강토지복은공작취득일정적성적,단잉연존재부분지방정부급항목단위중시불구、직능부문관리능력불강、신법율법규선전관철체후、상관배투조시불건전、부문지간불구협조、감관력도불구등문제,엄중영향료토지복은공작적유서추진。건의종륙개방면추진토지복은공작:(1)가쾌건전토지복은관리궤구,가강토지복은배투정책제도연구;(2)완선토지복은격려조시,촉진복은자금거도다원화;(3)가강토지복은관리대오건설,강화방안편제단위급인원관리;(4)가쾌토지복은감측감관신식화건설화계통연발;(5)가쾌개전역사유류화자연재해손훼토지복은조사평개공작;(6)리순토지복은방안화광산지질배경보호여치리회복방안관계。
This paper argues that the situation of Xinjiang land reclamation occurs as a result of the inadequate attention of some local governments and the project entities, and because of weak management ability of functional department, a lag in publicizing and implementing the new laws and regulations, unsound relevant matching measures, poor coordination between departments, and inadequate supervision, which has seriously inlfuenced the orderly process of the work of land reclamation. To address these problems, this paper proposes that we must improve management institutions, make great efforts on the research of supporting policies and systems, as well as incentives and fund channel multiplication. Meanwhile, we should strengthen management team construction, the information construction of monitoring and supervision, and system research and development. Finally, the investigation and evaluation work for reclamation of damages inherited from the past or by nature must be speeded up; and straightening out the relations between land reclamation planning and mine geological environmental protection and control planning.