汪营风电场%风机吊装%质量控制
汪營風電場%風機弔裝%質量控製
왕영풍전장%풍궤조장%질량공제
Wangying wind power station%wind turbine generator installation%quality control
利川汪营风电场装机容量为48 MW,安装2000 kW风力发电机组24台,塔架高度80 m,叶轮直径105 m。介绍了该厂风力发电机主要组成部件的安装实施过程及质量控制措施。
利川汪營風電場裝機容量為48 MW,安裝2000 kW風力髮電機組24檯,塔架高度80 m,葉輪直徑105 m。介紹瞭該廠風力髮電機主要組成部件的安裝實施過程及質量控製措施。
리천왕영풍전장장궤용량위48 MW,안장2000 kW풍력발전궤조24태,탑가고도80 m,협륜직경105 m。개소료해엄풍력발전궤주요조성부건적안장실시과정급질량공제조시。
In the Wangying wind power station in Lichuan City , 24 wind turbine generator units are installed with the to-tal capacity of 48 MW.For each unit , the capacity is 2 000 kW, with the tower of 80 meters high and the impeller of 105 meters diameter .In this paper , the installation process and quality control measures of main components of the gen-erators are introduced .