巡检系统%路线%顺序
巡檢繫統%路線%順序
순검계통%로선%순서
inspection system%inspection routes%inspection order
介绍了水布垭电厂巡检系统自年初投运以来,在使用、设置巡检线路等方面存在的一些不足,通过重新编制巡检路线、合理增减巡检条码或巡检项、设置巡检项顺序,以达到巡检工作的最优化。
介紹瞭水佈埡電廠巡檢繫統自年初投運以來,在使用、設置巡檢線路等方麵存在的一些不足,通過重新編製巡檢路線、閤理增減巡檢條碼或巡檢項、設置巡檢項順序,以達到巡檢工作的最優化。
개소료수포오전엄순검계통자년초투운이래,재사용、설치순검선로등방면존재적일사불족,통과중신편제순검로선、합리증감순검조마혹순검항、설치순검항순서,이체도순검공작적최우화。
Since the service of AMS inspection system in Shuibuya Power Station , problems were found in its operation , inspection route setting , etc.Some improvements of the inspection system are presented , including rescheduling the in-spection routes , changing the number of inspection barcodes or items reasonably and resetting the order of inspection i -tems.With these improvements , the inspection work is largely optimized .