对于构造带发育或者有地下暗河通道等复杂地质岩土工程而言,其施工受到工程地质状况的影响,难度较大,必须提高施工质量以及施工管理。本文以复杂地质岩土工程为着眼点,系统分析了其地质状况及对桩基施工的管理对策。
對于構造帶髮育或者有地下暗河通道等複雜地質巖土工程而言,其施工受到工程地質狀況的影響,難度較大,必鬚提高施工質量以及施工管理。本文以複雜地質巖土工程為著眼點,繫統分析瞭其地質狀況及對樁基施工的管理對策。
대우구조대발육혹자유지하암하통도등복잡지질암토공정이언,기시공수도공정지질상황적영향,난도교대,필수제고시공질량이급시공관리。본문이복잡지질암토공정위착안점,계통분석료기지질상황급대장기시공적관리대책。
For tectonic belt or underground river complex ge-ological and geotechnical engineering, the construction influe-nced by the engineering geological condition, has bigger diffi-cult, must improve the construction quality and construction management. In this paper, taking the complex geological and geotechnical engineering as the starting point, analyses the ge-ological situation and management countermeasure of the pile foundation construction.