地基%软基%吹填淤泥%加固%真空预压
地基%軟基%吹填淤泥%加固%真空預壓
지기%연기%취전어니%가고%진공예압
foundations%soft foundations%dredger sludge%reinforcement%vacuum preloading
采用浅表层技术对新吹填淤泥进行地基处理时,不同排水板间距对地基处理的效果必然不同。根据排水板间距的不同设置试验区,对试验区真空预压过程中的真空度、沉降、孔压进行监测。卸载时进行了钻孔取样和平板荷载试验,并计算了其固结度。
採用淺錶層技術對新吹填淤泥進行地基處理時,不同排水闆間距對地基處理的效果必然不同。根據排水闆間距的不同設置試驗區,對試驗區真空預壓過程中的真空度、沉降、孔壓進行鑑測。卸載時進行瞭鑽孔取樣和平闆荷載試驗,併計算瞭其固結度。
채용천표층기술대신취전어니진행지기처리시,불동배수판간거대지기처리적효과필연불동。근거배수판간거적불동설치시험구,대시험구진공예압과정중적진공도、침강、공압진행감측。사재시진행료찬공취양화평판하재시험,병계산료기고결도。
The effectiveness of foundation treatment with different drainage board spacing would be inevitably various, when reinforcement technology of the superficial surface layer was adopted to treat foundation with newly dredged sludge. The test area was set up according to the different drainage board spacing. The vacuum, settlement and pore pressure were monitored during vacuum preloading for the test area. The method of core boring and slab loading test were carried out, and the degree of consolidation was also calculated at the time of unloading.