山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2014年
19期
165-166
,共2页
地铁%工程地质条件%评价%围岩分级
地鐵%工程地質條件%評價%圍巖分級
지철%공정지질조건%평개%위암분급
metro%engineering geology condition%evaluation%surrounding rocks categorization
结合南京地铁三号线过江隧道地质环境和工程地质条件,对工程地质条件和影响工程地质条件的各种因素进行了分析和评价,同时针对影响隧道稳定性的因素,提出了工程措施及建议,为隧道设计、施工提供了依据。
結閤南京地鐵三號線過江隧道地質環境和工程地質條件,對工程地質條件和影響工程地質條件的各種因素進行瞭分析和評價,同時針對影響隧道穩定性的因素,提齣瞭工程措施及建議,為隧道設計、施工提供瞭依據。
결합남경지철삼호선과강수도지질배경화공정지질조건,대공정지질조건화영향공정지질조건적각충인소진행료분석화평개,동시침대영향수도은정성적인소,제출료공정조시급건의,위수도설계、시공제공료의거。
Referring to the geology environment and the engineering geology condition of river-crossing tunnel in Nanjing metro line 3, the engi-neering geology condition and the various factors which could influence the engineering geology of the tunnel are analyzed and evaluated. And ai-ming at the geology factors of influencing the tunnel’ s stability, many engineering measurements and advices tunnel are presented, which may be beneficial to the design and construction of the tunnel.