广东水利电力职业技术学院学报
廣東水利電力職業技術學院學報
엄동수리전력직업기술학원학보
JOURNAL OF GUANGDONG TECHNICAL COLLEGE OF WATER RESOURCES AND ELECTRIC ENGINEERING
2014年
2期
1-4,16
,共5页
平面控制网%高程控制网%复测成果%精度分析
平麵控製網%高程控製網%複測成果%精度分析
평면공제망%고정공제망%복측성과%정도분석
horizontal control network%vertical control network%repetition measurement result%precision analysis
阐述深圳抽水蓄能电站施工测量二等控制网复测实施过程,对复测成果的数据分析和精度评价显示本次复测成果精度良好,它将对深圳抽水蓄能电站的全面施工建设发挥重要作用。
闡述深圳抽水蓄能電站施工測量二等控製網複測實施過程,對複測成果的數據分析和精度評價顯示本次複測成果精度良好,它將對深圳抽水蓄能電站的全麵施工建設髮揮重要作用。
천술심수추수축능전참시공측량이등공제망복측실시과정,대복측성과적수거분석화정도평개현시본차복측성과정도량호,타장대심수추수축능전참적전면시공건설발휘중요작용。
The article introduces the repetition measurement process of the two grade GPS construction control network in Shenzhen pumped storage power station. The measurement results of data analysis and accuracy assessment show that the precision is good, and it will play an important role in Shenzhen pumped storage power station.