广西水利水电
廣西水利水電
엄서수이수전
GX WATER RESOURCES & HYDROPOWER ENGINEERING
2014年
3期
34-36
,共3页
河道%疏浚%滩涂%吹填%围堰%施工
河道%疏浚%灘塗%吹填%圍堰%施工
하도%소준%탄도%취전%위언%시공
River course%dredge%beach%hydraulic fill%cofferdam%construction
结合赣江生米九龙湖段河道疏浚及滩涂填筑工程施工实际情况和施工难点,详细论述了该工程施工设备的选定,疏浚吹填、围堰施工的工艺及方法。疏浚填筑工程已完工,达到了设计要求。
結閤贛江生米九龍湖段河道疏浚及灘塗填築工程施工實際情況和施工難點,詳細論述瞭該工程施工設備的選定,疏浚吹填、圍堰施工的工藝及方法。疏浚填築工程已完工,達到瞭設計要求。
결합공강생미구룡호단하도소준급탄도전축공정시공실제정황화시공난점,상세논술료해공정시공설비적선정,소준취전、위언시공적공예급방법。소준전축공정이완공,체도료설계요구。
Combined with the actual construction situation and difficulties of river course dredging and beach filling at the Shengmi-Jiulong Lake section of Ganjiang River, a detailed instruction was made on the selection of construc-tion equipment, the construction technique and methods of dredging, hydraulic filling and cofferdam. The project had been completed in conformity with design requirements.