超大直径%泥水盾构%带压进舱%换刀技术
超大直徑%泥水盾構%帶壓進艙%換刀技術
초대직경%니수순구%대압진창%환도기술
super-large diameter slurry shield%hyperbaric intervention%cutting tool replacement
对于复杂地质条件下的盾构掘进,刀具更换往往不可避免。由于地质的复杂性、多变性和周边条件的局限性,常常无法实施盾构周边土体加固常压进舱换刀。带压进舱换刀技术以无需地层加固、地质适应性强、对周边环境要求低和影响小等特点,解决了苛刻条件下的换刀难题。为了能实现强渗透地层气压状态下开挖面稳定,采用室内试验对进舱泥膜的气密性进行了研究,研究结果表明:进舱泥膜不仅要在开挖面形成一层致密的不透气泥皮型泥膜,还需在地层中形成均匀的透渗带泥膜,方能达到最佳的闭气效果。基于研究成果,南京纬三路过江通道N线工程实现了泥水盾构开挖面大面积气压支护进舱作业,并采用压缩空气作业与饱合潜水作业完成了盾构刀盘的维修和刀具的检查与更换。
對于複雜地質條件下的盾構掘進,刀具更換往往不可避免。由于地質的複雜性、多變性和週邊條件的跼限性,常常無法實施盾構週邊土體加固常壓進艙換刀。帶壓進艙換刀技術以無需地層加固、地質適應性彊、對週邊環境要求低和影響小等特點,解決瞭苛刻條件下的換刀難題。為瞭能實現彊滲透地層氣壓狀態下開挖麵穩定,採用室內試驗對進艙泥膜的氣密性進行瞭研究,研究結果錶明:進艙泥膜不僅要在開挖麵形成一層緻密的不透氣泥皮型泥膜,還需在地層中形成均勻的透滲帶泥膜,方能達到最佳的閉氣效果。基于研究成果,南京緯三路過江通道N線工程實現瞭泥水盾構開挖麵大麵積氣壓支護進艙作業,併採用壓縮空氣作業與飽閤潛水作業完成瞭盾構刀盤的維脩和刀具的檢查與更換。
대우복잡지질조건하적순구굴진,도구경환왕왕불가피면。유우지질적복잡성、다변성화주변조건적국한성,상상무법실시순구주변토체가고상압진창환도。대압진창환도기술이무수지층가고、지질괄응성강、대주변배경요구저화영향소등특점,해결료가각조건하적환도난제。위료능실현강삼투지층기압상태하개알면은정,채용실내시험대진창니막적기밀성진행료연구,연구결과표명:진창니막불부요재개알면형성일층치밀적불투기니피형니막,환수재지층중형성균균적투삼대니막,방능체도최가적폐기효과。기우연구성과,남경위삼로과강통도N선공정실현료니수순구개알면대면적기압지호진창작업,병채용압축공기작업여포합잠수작업완성료순구도반적유수화도구적검사여경환。
Cutting tool replacement is inevitable in long-distance shield boring under complicated geological conditions. Due to the complexity,variability and limitation of geological conditions,cutting tool replacement under atmospheric pressure under the condition of reinforcement of the ground surrounding the shield usually cannot be achieved.However, hyperbaric intervention (replacing the cutting tools under hyperbaric condition)has good geological adaptability and can be applied without reinforcement of the ground to solve the problems that come with the traditional way of cutting tool replacement in shield boring.Tests are made on the filter membrane under hyperbaric conditions,so as to obtain a stabilized tunnel face in highly-permeable formations under high pressure.Results show that filter membrane that can provide good support for the tunnel face is made up of two parts,i.e.,a compact airtight filter membrane on the tunnel face and a highly-permeable filter membrane zone in the ground.Based on the research results,hyperbaric intervention and saturated diving have been successfully conducted in N line project of Nanjing Weisan Road River-crossing Tunnel and the cutting tools of the super-large diameter slurry shield have been replaced successfully.