山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2014年
22期
101-102
,共2页
绳锯切割%工艺排孔%金刚绳
繩鋸切割%工藝排孔%金剛繩
승거절할%공예배공%금강승
wire saw cutting%technical row%diamond wire
为了满足建设项目特殊条件施工要求,项目技术部根据工程特点和经验,经多方调研比对,在某钢厂1549 mm 热连轧主轧线3号卷取机基础在线改造拆除中采用新的设备基础绳锯拆除方法,并在拆除过程中检查和监督,最终顺利完成目标,确保了工程的进度和质量。
為瞭滿足建設項目特殊條件施工要求,項目技術部根據工程特點和經驗,經多方調研比對,在某鋼廠1549 mm 熱連軋主軋線3號捲取機基礎在線改造拆除中採用新的設備基礎繩鋸拆除方法,併在拆除過程中檢查和鑑督,最終順利完成目標,確保瞭工程的進度和質量。
위료만족건설항목특수조건시공요구,항목기술부근거공정특점화경험,경다방조연비대,재모강엄1549 mm 열련알주알선3호권취궤기출재선개조탁제중채용신적설비기출승거탁제방법,병재탁제과정중검사화감독,최종순리완성목표,학보료공정적진도화질량。
In order to meet special construction project demands,according to engineering features and experience,based on survey and compar-ison,the paper applies new equipment foundation wire saw cutting method in 1 549 mm heat-connection rolling line No. 3 coiling machine trans-formation,and carries out examination and supervision in removal process,finally successfully achieves the goal and guarantees the engineering schedule and quality.