针对兰新铁路第二双线沿线大温差、戈壁地区恶劣的气候环境,论证了桥墩采取特殊保温养护措施的必要性,并对常用保温材料及提出的橡塑板保温材料进行机理分析、数值计算、应用实例论证,最终选择保温性能良好的柔性保温绝热橡塑板,并辅以土工布保湿进行养护。根据理论及模拟计算确定的保温材料,对比两种具有代表性的养护方式(土工布+橡塑板包裹、塑料布+棉布+彩条布包裹)对桥墩温差及温度应力的影响,结合室内和现场试验,结果表明:常规的养护方式难以满足要求,通过橡塑板保温材料的应用,可以把桥墩水化热里表温差控制在20℃规范要求内,保证混凝土不因里表温差过大,而导致混凝土桥墩开裂。根据研究成果,提出了现场桥墩养护的指导性意见。大温差、干旱戈壁地区桥墩保温养护试验研究为兰新铁路第二双线桥墩养护提供了理论支持和实践经验,也提出了一种橡塑板包裹养护桥墩的新方法。
針對蘭新鐵路第二雙線沿線大溫差、戈壁地區噁劣的氣候環境,論證瞭橋墩採取特殊保溫養護措施的必要性,併對常用保溫材料及提齣的橡塑闆保溫材料進行機理分析、數值計算、應用實例論證,最終選擇保溫性能良好的柔性保溫絕熱橡塑闆,併輔以土工佈保濕進行養護。根據理論及模擬計算確定的保溫材料,對比兩種具有代錶性的養護方式(土工佈+橡塑闆包裹、塑料佈+棉佈+綵條佈包裹)對橋墩溫差及溫度應力的影響,結閤室內和現場試驗,結果錶明:常規的養護方式難以滿足要求,通過橡塑闆保溫材料的應用,可以把橋墩水化熱裏錶溫差控製在20℃規範要求內,保證混凝土不因裏錶溫差過大,而導緻混凝土橋墩開裂。根據研究成果,提齣瞭現場橋墩養護的指導性意見。大溫差、榦旱戈壁地區橋墩保溫養護試驗研究為蘭新鐵路第二雙線橋墩養護提供瞭理論支持和實踐經驗,也提齣瞭一種橡塑闆包裹養護橋墩的新方法。
침대란신철로제이쌍선연선대온차、과벽지구악렬적기후배경,론증료교돈채취특수보온양호조시적필요성,병대상용보온재료급제출적상소판보온재료진행궤리분석、수치계산、응용실례론증,최종선택보온성능량호적유성보온절열상소판,병보이토공포보습진행양호。근거이론급모의계산학정적보온재료,대비량충구유대표성적양호방식(토공포+상소판포과、소료포+면포+채조포포과)대교돈온차급온도응력적영향,결합실내화현장시험,결과표명:상규적양호방식난이만족요구,통과상소판보온재료적응용,가이파교돈수화열리표온차공제재20℃규범요구내,보증혼응토불인리표온차과대,이도치혼응토교돈개렬。근거연구성과,제출료현장교돈양호적지도성의견。대온차、간한과벽지구교돈보온양호시험연구위란신철로제이쌍선교돈양호제공료이론지지화실천경험,야제출료일충상소판포과양호교돈적신방법。
According to the particularity of climate environment of large temperature and difference in gobi region along the second double line of Lan-Xin Railway,the necessity of pier insulation maintenance is demonstrated,the common insulating material and rubber board heat preservation material are analyzed by mechanism analysis and numerical calculation,and they are demonstrated by application example.The flexible rubber board is chosen for its good insulation,and the geo-textile is used for curing.The data collected is analyzed to contrast the influence of two represent-ative maintenance ways (geotextile+rubber board package and plastic+cotton+striped cloth package)on temperature and stress of pier by the interior of insulating material and combining with the application example.The results indicate that the regular maintenance way is difficult to meet the requirements,and the application of rubber board which is heat preservation material can make the pier's hydration heat temperature of internal-external temperature difference at 20 ℃.It can guarantee specification requirements of internal-external temperature difference and can avoid excessive temperature arousing concrete cracking of concrete pier.Finally,according to the re-search results,the pier maintenance opinions are put forward.The test research of pier insulation maintenance in gobi region of extreme large temperature difference and drought provides theoreti-cal support and practical experience for pier maintenance on the second double line of Lan-Xin Railway.Furthermore,a new method is put forward for pier maintenance of the rubber and plastic board package.