矿业工程
礦業工程
광업공정
MINING ENGINEERING
2014年
4期
17-18,19
,共3页
爆破%铲装方法%小台阶开采
爆破%鏟裝方法%小檯階開採
폭파%산장방법%소태계개채
blasting%shoveling and loading method%small bench mining
通过对西沟矿东山头详细的勘察研究,依据实际形成的3个小台阶,决定采用小台阶开采方法,边缘地段采用小孔密集爆破方法,挖掘机配合电铲铲装,在实际开采过程中取得了成功。
通過對西溝礦東山頭詳細的勘察研究,依據實際形成的3箇小檯階,決定採用小檯階開採方法,邊緣地段採用小孔密集爆破方法,挖掘機配閤電鏟鏟裝,在實際開採過程中取得瞭成功。
통과대서구광동산두상세적감찰연구,의거실제형성적3개소태계,결정채용소태계개채방법,변연지단채용소공밀집폭파방법,알굴궤배합전산산장,재실제개채과정중취득료성공。
Through the detailed survey and research about the east mountain of Xigou Mine,and based on the actually formed three small benches,it is decided to adopt the small bench mining method.For the edge location,the small holes intensive blasting method in the edge location is adopted.With excavators matching with electric shovel for shoveling and loading,it has been proven to be success in actual mining process.