对于考虑不确定性风电等新能源接入的电力系统调度,合理的潮流分布对降低线路过载风险、提高经济调度的鲁棒性具有重要意义。为此,提出传输安全裕度和备用可用性的概念,并建立考虑传输安全裕度的经济调度模型,通过引入合理的成本约束,保证运行成本与传统调度时相比不会显著增加。从传输安全裕度、备用可用性、安全裕度与运行成本的关系3个方面进行数值测试,验证方法的有效性。结果表明,该方法可提高传统调度中阻塞或重载线路的安全裕度,有效避免因线路传输容量限制而导致的备用不足问题,从而提高调度计划应对不确定性扰动的能力,因此该模型可获得安全性和经济性更好的平衡。
對于攷慮不確定性風電等新能源接入的電力繫統調度,閤理的潮流分佈對降低線路過載風險、提高經濟調度的魯棒性具有重要意義。為此,提齣傳輸安全裕度和備用可用性的概唸,併建立攷慮傳輸安全裕度的經濟調度模型,通過引入閤理的成本約束,保證運行成本與傳統調度時相比不會顯著增加。從傳輸安全裕度、備用可用性、安全裕度與運行成本的關繫3箇方麵進行數值測試,驗證方法的有效性。結果錶明,該方法可提高傳統調度中阻塞或重載線路的安全裕度,有效避免因線路傳輸容量限製而導緻的備用不足問題,從而提高調度計劃應對不確定性擾動的能力,因此該模型可穫得安全性和經濟性更好的平衡。
대우고필불학정성풍전등신능원접입적전력계통조도,합리적조류분포대강저선로과재풍험、제고경제조도적로봉성구유중요의의。위차,제출전수안전유도화비용가용성적개념,병건립고필전수안전유도적경제조도모형,통과인입합리적성본약속,보증운행성본여전통조도시상비불회현저증가。종전수안전유도、비용가용성、안전유도여운행성본적관계3개방면진행수치측시,험증방법적유효성。결과표명,해방법가제고전통조도중조새혹중재선로적안전유도,유효피면인선로전수용량한제이도치적비용불족문제,종이제고조도계화응대불학정성우동적능력,인차해모형가획득안전성화경제성경호적평형。
For generation schedules considering uncertain wind power resources integrated into power grids, obtaining reasonable power flow is very important to lower the overload risks of transmission lines and increase the system security and robustness. The concepts of transmission safety margin and reserve availability were proposed in this paper, and then a transmission safety margin constrained unit commitment formulation was established. Reasonable cost constraint was added to guarantee that there could be little increase in the operation cost compared with conventional unit commitment. Numerical tests were conducted in terms of transmission safety margin, reserve availability under uncertain wind power output and variation tendency of transmission security margin with generation costs to verify the effectiveness of the method. It turns out that this method can increase the safety margin of congesting or heavy-loaded lines compared with conventional unit commitment model, the reserve availability problem caused by transmission capacity limits can also be effectively avoided and the robustness of the scheduling planes against uncertainty is improved. Thus, a compromise between secure and economic operation can be achieved.