以浙江移动杭州分公司营业中心项目主体结构3.6m预应力梁悬挑结构为例,介绍了采用低松驰高强钢铰线解决悬挑结构的配筋问题。施工中采用性能优良的QM锚具和QMJ挤压锚具,保证了工程质量,提高了层高的净空问题,满足了项目的实际需求。
以浙江移動杭州分公司營業中心項目主體結構3.6m預應力樑懸挑結構為例,介紹瞭採用低鬆馳高彊鋼鉸線解決懸挑結構的配觔問題。施工中採用性能優良的QM錨具和QMJ擠壓錨具,保證瞭工程質量,提高瞭層高的淨空問題,滿足瞭項目的實際需求。
이절강이동항주분공사영업중심항목주체결구3.6m예응력량현도결구위례,개소료채용저송치고강강교선해결현도결구적배근문제。시공중채용성능우량적QM묘구화QMJ제압묘구,보증료공정질량,제고료층고적정공문제,만족료항목적실제수구。
Taking the main structure prestressed beam with 3.6m long cantilever structure of the Zhejiang mobile Hangzhou branch business center project as an example, using low relaxation and high strength steel hinge line to solve some reinforcement problems of cantilever structure are introduced. It’s indicated that using QM anchorage and QMJ ex-trusion anchorage with excellent performances can ensure the engineering quality, improve the height clearance problems and meet the needs of the project in the construction.