针对南方电网多类型电源协调运行以及西电东送的特点,提出了南方电网节能与经济运行评价方法。该方法基于时序负荷曲线,分别进行新能源的出力模拟、电源检修安排、跨流域梯级水电调度。在此基础上,根据南方电网的一系列运行约束与调度规则,进行考虑多类型电源相互协调与网损修正的机组组合优化,实现对南方电网长时间运行层面进行精细化的逐日小时级连续的“全景”模拟,最后根据逐日运行模拟结果计算系统运行成本、燃料消耗以及污染物排放,实现系统未来运行的节能与经济性评价。最后,以 IEEE-RTS 79系统算例和广东电网2015年运行模拟算例验证了所述方法的有效性。
針對南方電網多類型電源協調運行以及西電東送的特點,提齣瞭南方電網節能與經濟運行評價方法。該方法基于時序負荷麯線,分彆進行新能源的齣力模擬、電源檢脩安排、跨流域梯級水電調度。在此基礎上,根據南方電網的一繫列運行約束與調度規則,進行攷慮多類型電源相互協調與網損脩正的機組組閤優化,實現對南方電網長時間運行層麵進行精細化的逐日小時級連續的“全景”模擬,最後根據逐日運行模擬結果計算繫統運行成本、燃料消耗以及汙染物排放,實現繫統未來運行的節能與經濟性評價。最後,以 IEEE-RTS 79繫統算例和廣東電網2015年運行模擬算例驗證瞭所述方法的有效性。
침대남방전망다류형전원협조운행이급서전동송적특점,제출료남방전망절능여경제운행평개방법。해방법기우시서부하곡선,분별진행신능원적출력모의、전원검수안배、과류역제급수전조도。재차기출상,근거남방전망적일계렬운행약속여조도규칙,진행고필다류형전원상호협조여망손수정적궤조조합우화,실현대남방전망장시간운행층면진행정세화적축일소시급련속적“전경”모의,최후근거축일운행모의결과계산계통운행성본、연료소모이급오염물배방,실현계통미래운행적절능여경제성평개。최후,이 IEEE-RTS 79계통산례화엄동전망2015년운행모의산례험증료소술방법적유효성。
A methodology of power system energy saving and economy operation evaluation for China Southern power grid is proposed,which takes into consideration the characteristics of the coordinated operation of multiple types of generators and massive electricity delivery from the west to the east.The methodology is based on the chronological operation simulation of power system.Several sub-modules for mid/long term operation simulation are proposed including operation simulation of renewable energy,generation maintenance simulation,and dispatch optimization of inter-basin cascade hydropower plants.A unit commitment model is also proposed by taking into consideration the operation constraints on the power system,practical scheduling rules,coordinate dispatching of multiple types of generations,and the modification of transmission losses.The proposed methodology facilitates a full view of the prospective operation for the power system on an hourly basis.The operating costs,fuel costs and carbon emissions of the power system over the whole planning year can be calculated based on the simulation results to achieve the energy saving and economy operation evaluation for the power system planning scheme. Finally,an IEEE-RTS 79 test system and one of the blueprint of Guangdong power grid for 201 5 are used to validate the proposed methodology.