干武铁路%增建二线%长城遗址%方案比选
榦武鐵路%增建二線%長城遺阯%方案比選
간무철로%증건이선%장성유지%방안비선
Ganwu railway%addition of the second line%the ancient ruins of the Great Wall%scheme comparison
干武增建二线工程沿线分布有3处长城遗址,为保护长城遗址,干武二线结合技术、经济条件研究了3个不同的线路方案,分别为并行既有线路基方案、右侧豁口通过长城方案、桥跨长城方案。经综合比选,推荐采用右侧豁口通过长城方案。
榦武增建二線工程沿線分佈有3處長城遺阯,為保護長城遺阯,榦武二線結閤技術、經濟條件研究瞭3箇不同的線路方案,分彆為併行既有線路基方案、右側豁口通過長城方案、橋跨長城方案。經綜閤比選,推薦採用右側豁口通過長城方案。
간무증건이선공정연선분포유3처장성유지,위보호장성유지,간무이선결합기술、경제조건연구료3개불동적선로방안,분별위병행기유선로기방안、우측활구통과장성방안、교과장성방안。경종합비선,추천채용우측활구통과장성방안。
Three Great Wall ruins are found along the Ganwu second line railway.To protect the Great Wall ruins,three different route plans of Ganwu second line railway are studied combined with technical and economic conditions.The routes are parallel existing roadbed project,line through gouges on the right side,bridge over the Great Wall.Through compre-hensive comparison,line through gouges on the right side is recommended for the solution through the Great Wall.