石油钻采工艺
石油鑽採工藝
석유찬채공예
OIL DRILLING & PRODUCTION TECHNOLOGY
2014年
4期
105-108
,共4页
吴均%路海伟%杨昊%彭通%冯建松%赵颖
吳均%路海偉%楊昊%彭通%馮建鬆%趙穎
오균%로해위%양호%팽통%풍건송%조영
脲醛树脂%堵水%增稠%固相颗粒
脲醛樹脂%堵水%增稠%固相顆粒
뇨철수지%도수%증주%고상과립
urea formaldehyde resin%water plugging%thickening%solid particles
针对油水井实施堵水过程中难以准确控制用量、堵剂浪费大、施工风险高的问题,开展了溶液类堵剂、固相颗粒复合堵水体系研究。在堵水剂挤注过程中固相颗粒不断滤失封堵,自动调整进液通道,最终实现均匀、整体封堵。通过对脲醛树脂在稠化、固相填料两方面的系统研究,形成了脲醛树脂为主体的新型堵水剂。应用中针对不同封堵要求,调整不同稠化及填料质量分数,实现深部处理与炮眼封堵的一体化无缝处理;堵剂挤注压力完全控制在安全范围内并可顺利顶替到位,直接关井候凝,大大降低了施工风险,技术优势明显,取得了较好的矿场应用效果。
針對油水井實施堵水過程中難以準確控製用量、堵劑浪費大、施工風險高的問題,開展瞭溶液類堵劑、固相顆粒複閤堵水體繫研究。在堵水劑擠註過程中固相顆粒不斷濾失封堵,自動調整進液通道,最終實現均勻、整體封堵。通過對脲醛樹脂在稠化、固相填料兩方麵的繫統研究,形成瞭脲醛樹脂為主體的新型堵水劑。應用中針對不同封堵要求,調整不同稠化及填料質量分數,實現深部處理與砲眼封堵的一體化無縫處理;堵劑擠註壓力完全控製在安全範圍內併可順利頂替到位,直接關井候凝,大大降低瞭施工風險,技術優勢明顯,取得瞭較好的礦場應用效果。
침대유수정실시도수과정중난이준학공제용량、도제낭비대、시공풍험고적문제,개전료용액류도제、고상과립복합도수체계연구。재도수제제주과정중고상과립불단려실봉도,자동조정진액통도,최종실현균균、정체봉도。통과대뇨철수지재주화、고상전료량방면적계통연구,형성료뇨철수지위주체적신형도수제。응용중침대불동봉도요구,조정불동주화급전료질량분수,실현심부처리여포안봉도적일체화무봉처리;도제제주압력완전공제재안전범위내병가순리정체도위,직접관정후응,대대강저료시공풍험,기술우세명현,취득료교호적광장응용효과。
In view of such problems as difficulty in controlling the amount of plugging agents, large waste of the agents and high risks in the process of water plugging in oil/water wells, was research was carried out on composite water plugging system composed of solution-type plugging agents and solid particles; when injecting the water plugging agents, the solid particles in its constantly filtrated out and pluged the water, automatically adjusted its inlet pathways and finally realized even and overall plugging. After systematic study on urea-formaldehyde resin in terms of thickening and solid packing, we developed a new water plugging with urea-formaldehyde resin as the major component. For different plugging requirements, we can adjust the different thickening and packing concentration and real-ized the seamless plugging integrating deep treatment and perforation plugging. The injection pressure for plugging agent is completely controlled within a safe range and can successfully displace to the desired location, then we can directly shut in the well and wait for setting, which can greatly reduce the operation risks. This technology has many merits and works effectively in the fields.