文23气藏盖层厚、埋藏浅,具有良好的储气库建库条件。但该区块上存在一口工程报废井文23-6X 井,由于其钻穿了盖层,影响到气藏的密封性,因此对其成功封堵成为建库的关键。2010年用4个月的时间在文23-6X 井上部地层钻了6个井眼,寻找鱼头均未成功。2013年在国内首次引进英国科学钻井公司的磁测量距离修正技术,尝试钻文23-6J 平行救援井,从鱼底下部连通文23-6X 井,历时近6个半月,在下部地层钻了5个井眼,实现2次碰鱼底、3次交叉老井眼,在第5支井眼内定方位复合射孔挤水泥,经负压测试验证,封堵文23-6X 井成功,达到了文23气藏建库要求。
文23氣藏蓋層厚、埋藏淺,具有良好的儲氣庫建庫條件。但該區塊上存在一口工程報廢井文23-6X 井,由于其鑽穿瞭蓋層,影響到氣藏的密封性,因此對其成功封堵成為建庫的關鍵。2010年用4箇月的時間在文23-6X 井上部地層鑽瞭6箇井眼,尋找魚頭均未成功。2013年在國內首次引進英國科學鑽井公司的磁測量距離脩正技術,嘗試鑽文23-6J 平行救援井,從魚底下部連通文23-6X 井,歷時近6箇半月,在下部地層鑽瞭5箇井眼,實現2次踫魚底、3次交扠老井眼,在第5支井眼內定方位複閤射孔擠水泥,經負壓測試驗證,封堵文23-6X 井成功,達到瞭文23氣藏建庫要求。
문23기장개층후、매장천,구유량호적저기고건고조건。단해구괴상존재일구공정보폐정문23-6X 정,유우기찬천료개층,영향도기장적밀봉성,인차대기성공봉도성위건고적관건。2010년용4개월적시간재문23-6X 정상부지층찬료6개정안,심조어두균미성공。2013년재국내수차인진영국과학찬정공사적자측량거리수정기술,상시찬문23-6J 평행구원정,종어저하부련통문23-6X 정,력시근6개반월,재하부지층찬료5개정안,실현2차팽어저、3차교차로정안,재제5지정안내정방위복합사공제수니,경부압측시험증,봉도문23-6X 정성공,체도료문23기장건고요구。
Wen-23 gas pool has thick caprock and small burial depth, and has favorable conditions for building gas storage. How-ever, this block already has Well 23-6X, which has been abandoned, but it affects the sealing of the gas pool because it penetrates the caprock. Therefore, successful plugging of this well is a key to building the gas storage. In 2010, six holes were drilled in the upper formation of Wen 23-6X in four months, but they all failed in locating the fish head. In 2013, the distance correction technology with magnetic measurement was first introduced from British Scientific Drilling Company and tried to drill parallel relief well Wen 23-6J and to connect with Wen 23-6X from below the fish bottom. For nearly six and half months, five holes were drilled in the lower formation, tagged fish bottom twice, crossed with the old hole three times, located the azimuth and complex perforation and cement squeezing were conducted in the fifth hole. Negative pressure test showed that the Wen 23-6X was successfully plugged and met the requirement for gas storage building in Wen 23 gas pool.