石油钻采工艺
石油鑽採工藝
석유찬채공예
OIL DRILLING & PRODUCTION TECHNOLOGY
2014年
4期
18-21
,共4页
叶周明%刘小刚%崔治军%侯冠中%徐鲲%刘峰
葉週明%劉小剛%崔治軍%侯冠中%徐鯤%劉峰
협주명%류소강%최치군%후관중%서곤%류봉
大尺寸井眼%防斜打快%钻井液工艺%固井技术
大呎吋井眼%防斜打快%鑽井液工藝%固井技術
대척촌정안%방사타쾌%찬정액공예%고정기술
large size hole%deviation control and fast drilling%drilling fluid technology%cementing technology
经过三压力研究和实钻邻区资料证实渤海油田某区块中深部地层存在高温高压。在该区块某探井实际钻探中,地层压力系数1.3,最高达1.65,井底温度高达178℃,根据地层压力及地质特征进行井身结构优化,?444.5 mm 大尺寸井眼钻进至馆陶组顶部垂深2700 m,才能减轻中深部高温高压地层的钻探风险,在渤海地区,?444.5 mm 大尺寸井眼钻进至2700 m 尚属首次,通过钻具组合优化与轨迹控制、海水/膨润土浆钻进、优化水泥浆体系和浆柱结构等技术,使得该井大尺寸井眼钻探过程中,在防斜打快、钻井液工艺及固井技术等方面均取得了突破,为钻开高温高压井段,进行地质评价提供了有力保障。
經過三壓力研究和實鑽鄰區資料證實渤海油田某區塊中深部地層存在高溫高壓。在該區塊某探井實際鑽探中,地層壓力繫數1.3,最高達1.65,井底溫度高達178℃,根據地層壓力及地質特徵進行井身結構優化,?444.5 mm 大呎吋井眼鑽進至館陶組頂部垂深2700 m,纔能減輕中深部高溫高壓地層的鑽探風險,在渤海地區,?444.5 mm 大呎吋井眼鑽進至2700 m 尚屬首次,通過鑽具組閤優化與軌跡控製、海水/膨潤土漿鑽進、優化水泥漿體繫和漿柱結構等技術,使得該井大呎吋井眼鑽探過程中,在防斜打快、鑽井液工藝及固井技術等方麵均取得瞭突破,為鑽開高溫高壓井段,進行地質評價提供瞭有力保障。
경과삼압력연구화실찬린구자료증실발해유전모구괴중심부지층존재고온고압。재해구괴모탐정실제찬탐중,지층압력계수1.3,최고체1.65,정저온도고체178℃,근거지층압력급지질특정진행정신결구우화,?444.5 mm 대척촌정안찬진지관도조정부수심2700 m,재능감경중심부고온고압지층적찬탐풍험,재발해지구,?444.5 mm 대척촌정안찬진지2700 m 상속수차,통과찬구조합우화여궤적공제、해수/팽윤토장찬진、우화수니장체계화장주결구등기술,사득해정대척촌정안찬탐과정중,재방사타쾌、찬정액공예급고정기술등방면균취득료돌파,위찬개고온고압정단,진행지질평개제공료유력보장。
3D pressure study and the data of drilled wells in vicinity prove that there is high temperature and high pressure in the middle and deep formations in some block of Bohai Oilfield. While drilling some exploration well in this block, the formation pressure coefficient was 1.3, max. 1.65, and bottom temperature was up to 178 ℃. The wellbore configuration was optimized based on formation pressure and geologic features. When the ?444.5 mm large hole was drilled to the top of Guantao Formation with a vertical depth of 2 700 m, the risk in drilling of HTHP formation in the middle and deep formations could be mitigated. In Bohai area, it was the first time that ?444.5 mm hole was drilled to 2 700 m. Through technologies like BHA optimization and trajectory control, drilling with seawater/bentonite fluid, optimized cement slurry system and fluid column structure, etc., breakthroughs were made in deviation control and fast drilling, drilling fluid technology and cementing technology while drilling this large size hole, which provides guarantee for drilling into the HTHP section and for conducting geologic assessment.