结合缅甸DAPEIN(I)水电站地形地质条件和工程实际情况,对调压井进行了布置、选型与设计计算。工程投运至今,调压井安全稳定,有效地解决了因电站负荷变化引起的水锤效应,确保电站安全稳定运行。
結閤緬甸DAPEIN(I)水電站地形地質條件和工程實際情況,對調壓井進行瞭佈置、選型與設計計算。工程投運至今,調壓井安全穩定,有效地解決瞭因電站負荷變化引起的水錘效應,確保電站安全穩定運行。
결합면전DAPEIN(I)수전참지형지질조건화공정실제정황,대조압정진행료포치、선형여설계계산。공정투운지금,조압정안전은정,유효지해결료인전참부하변화인기적수추효응,학보전참안전은정운행。
Combined with the topographical and geological conditions as well as the actual situation of Dapein(I) Hydropower Project in Myanmar,an introduction was made on the layout,type selection and calculation of surge tanks. The surge tanks have been safe and stable since they were put into operation,which effectively alleviates the water hammer influence caused by power load variation,so as to ensure the safety and stable operation of project.