江洋畈生态公园人行木栈桥于2010年9月建成后仅4月,桥面沉降达200mm。为保证木栈桥的安全运营,从2011年1月开始对木栈桥沉降进行了观测。结果表明,桥面沉降全部是PE管悬浮基础下西湖疏浚泥炭质土的沉降。
江洋畈生態公園人行木棧橋于2010年9月建成後僅4月,橋麵沉降達200mm。為保證木棧橋的安全運營,從2011年1月開始對木棧橋沉降進行瞭觀測。結果錶明,橋麵沉降全部是PE管懸浮基礎下西湖疏浚泥炭質土的沉降。
강양판생태공완인행목잔교우2010년9월건성후부4월,교면침강체200mm。위보증목잔교적안전운영,종2011년1월개시대목잔교침강진행료관측。결과표명,교면침강전부시PE관현부기출하서호소준니탄질토적침강。
Jiangyangfan eco-park pedestrian bridge was built in September 2010,but it sank more than 200 mm only four months later. We have been monitoring the settlement from January 2011 in order to assure continuing safety. The result shows that all the settlements are caused by the peat soil under the PE pipe footings.