中国港湾建设
中國港灣建設
중국항만건설
CHINA HARBOUR ENGINEERING
2014年
8期
12-15
,共4页
桩基%布置形式%高桩码头%平行移桩
樁基%佈置形式%高樁碼頭%平行移樁
장기%포치형식%고장마두%평행이장
pile foundation%arrangement type%high-pile wharf%parallel move the pile
结合工程实例对高桩码头排架桩基呈三角形布置的特殊结构进行有限元计算分析,研究了平行移桩简化法以及局部桩基刚度变化对结构受力的影响。结果表明,采用文中推荐的简化方法进行结构计算可以满足工程设计要求。
結閤工程實例對高樁碼頭排架樁基呈三角形佈置的特殊結構進行有限元計算分析,研究瞭平行移樁簡化法以及跼部樁基剛度變化對結構受力的影響。結果錶明,採用文中推薦的簡化方法進行結構計算可以滿足工程設計要求。
결합공정실례대고장마두배가장기정삼각형포치적특수결구진행유한원계산분석,연구료평행이장간화법이급국부장기강도변화대결구수력적영향。결과표명,채용문중추천적간화방법진행결구계산가이만족공정설계요구。
The local bent pile foundation of high-pile wharf is arranged in triangular shape, we carried the finite element analy sis on this special structure combining with engineering examples, studied the simplified method for parallel moving the pile and the influence of the local pile foundation stiffness on the structure stress. The results show that using the recommended simpli-fied method to do the structural calculation can meet the requirements of engineering design.