无粘结预应力锚索%栈桥%危岩体加固%索风营水电站
無粘結預應力錨索%棧橋%危巖體加固%索風營水電站
무점결예응력묘색%잔교%위암체가고%색풍영수전참
unboned pre-stressed anchor cable%trestle%dangerous rock reinforcement%Suofengying Hydropower Station
乌江索风营水电站Dr2危岩体加固施工作业面高差大、场地小、施工干扰大;危岩体岩层复杂,多条破碎带分布在山体中,必须穿越L1和L2裂隙。对索风营水电站Dr2危岩体距最低平台高差达110~134.5 m的上部锚索的特殊施工技术进行了介绍。
烏江索風營水電站Dr2危巖體加固施工作業麵高差大、場地小、施工榦擾大;危巖體巖層複雜,多條破碎帶分佈在山體中,必鬚穿越L1和L2裂隙。對索風營水電站Dr2危巖體距最低平檯高差達110~134.5 m的上部錨索的特殊施工技術進行瞭介紹。
오강색풍영수전참Dr2위암체가고시공작업면고차대、장지소、시공간우대;위암체암층복잡,다조파쇄대분포재산체중,필수천월L1화L2렬극。대색풍영수전참Dr2위암체거최저평태고차체110~134.5 m적상부묘색적특수시공기술진행료개소。
Difficulties of large height difference of construction surface, small working site and complicated formations of dangerous rock exist in Suofengying hydropower station of Wujiang project with several fracture zones distributing in the mountain, the borehole must be drilled through fractures.The paper introduces the special construction technology used in upper anchor cable construction for Dr2 dangerous rocks in Suofengying hydropower station, where it has 110 ~134.5m height difference to the lowest platform.