为了对里彦煤矿建筑物下的煤炭进行合理地开采,针对该区域两煤层间距小、地面建筑物密集等特点,提出了采用条带开采方法保护地面建筑物并回收部分煤炭资源的方案。首先运用山东科技大学自主研发的“地表移动变形预计计算系统”软件确定里彦煤矿的条带开采的采出率应该小于60%;然后应用威尔逊理论确定出上层煤条带开采关键参数为采40 m留30 m;最后应用数值模拟研究了两层煤条带开采时条带煤柱相互作用的规律,确定下层煤条带开采时应采用与上层煤相同的关键参数。论文分析了上部煤层条带开采对下煤层的应力分布影响,充分考虑了下煤层条带开采前的应力环境,并在此基础上研究了下煤层条带开采工作面的位置的选择及关键参数的确定方法,这是在之前的近距离煤层群条带开采中没有涉及的,对近距离煤层群条带开采设计具有指导作用。
為瞭對裏彥煤礦建築物下的煤炭進行閤理地開採,針對該區域兩煤層間距小、地麵建築物密集等特點,提齣瞭採用條帶開採方法保護地麵建築物併迴收部分煤炭資源的方案。首先運用山東科技大學自主研髮的“地錶移動變形預計計算繫統”軟件確定裏彥煤礦的條帶開採的採齣率應該小于60%;然後應用威爾遜理論確定齣上層煤條帶開採關鍵參數為採40 m留30 m;最後應用數值模擬研究瞭兩層煤條帶開採時條帶煤柱相互作用的規律,確定下層煤條帶開採時應採用與上層煤相同的關鍵參數。論文分析瞭上部煤層條帶開採對下煤層的應力分佈影響,充分攷慮瞭下煤層條帶開採前的應力環境,併在此基礎上研究瞭下煤層條帶開採工作麵的位置的選擇及關鍵參數的確定方法,這是在之前的近距離煤層群條帶開採中沒有涉及的,對近距離煤層群條帶開採設計具有指導作用。
위료대리언매광건축물하적매탄진행합리지개채,침대해구역량매층간거소、지면건축물밀집등특점,제출료채용조대개채방법보호지면건축물병회수부분매탄자원적방안。수선운용산동과기대학자주연발적“지표이동변형예계계산계통”연건학정리언매광적조대개채적채출솔응해소우60%;연후응용위이손이론학정출상층매조대개채관건삼수위채40 m류30 m;최후응용수치모의연구료량층매조대개채시조대매주상호작용적규률,학정하층매조대개채시응채용여상층매상동적관건삼수。논문분석료상부매층조대개채대하매층적응력분포영향,충분고필료하매층조대개채전적응력배경,병재차기출상연구료하매층조대개채공작면적위치적선택급관건삼수적학정방법,저시재지전적근거리매층군조대개채중몰유섭급적,대근거리매층군조대개채설계구유지도작용。
In order to rationally mining coal under buildings in Liyan Colliery , considering the characteristic of closed coal-seams and dense surface buildings , the suggestion of applying strip mining to protecting surface buildings and mining part coal resource was pres -ent.Applying Surface Movement Deformation Prediction Calculation System developed by Shandong University of Science &Technolo -gy, mining ratio of strip mining was determined to be less than 60%.40m mining width and 30m coal-pillar width was determined by Willson theory.Mutual influence rule of two coal-seams'strip coal-pillars was analyzed with numerical simulation and it was obtained that key parameters of under coal-seam mining should be identical with that of upper coal-seam mining.Influence of upper coal-seam mining on stress distribution of under coal-seam mining was analyzed .Considering stress environment before strip mining under coal-seam, strip mining face location selection and key parameters were determined , which was not referred in before closed coal-seam strip mining and provided reference for closed coal-seams strip mining design .