山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2014年
27期
54-55
,共2页
地基加固%铁塔%防护围栏%施工
地基加固%鐵塔%防護圍欄%施工
지기가고%철탑%방호위란%시공
foundation consolidation%iron tower%prevention enclosure%construction
以安托山高压电塔地基加固工程为例,对电塔地基加固方案进行了研究,提出了电塔自身加固和对车站围护结构加固的方案,并从铁塔临时拉线、袖阀管注浆加固施工、镀锌钢管防护围栏施工等方面作了阐述,为设计地基加固方案提供了新思路。
以安託山高壓電塔地基加固工程為例,對電塔地基加固方案進行瞭研究,提齣瞭電塔自身加固和對車站圍護結構加固的方案,併從鐵塔臨時拉線、袖閥管註漿加固施工、鍍鋅鋼管防護圍欄施工等方麵作瞭闡述,為設計地基加固方案提供瞭新思路。
이안탁산고압전탑지기가고공정위례,대전탑지기가고방안진행료연구,제출료전탑자신가고화대차참위호결구가고적방안,병종철탑림시랍선、수벌관주장가고시공、도자강관방호위란시공등방면작료천술,위설계지기가고방안제공료신사로。
Taking the foundation consolidation project of high-voltage tower at Antuo Mountain as the example,the paper researches the tower foundation consolidation scheme,points out the scheme for the electric tower consideration and station enclosure structure consolidation,and il-lustrates the tower temporary stay,sleeve valve barrel grouting consolidation construction,and galvanized steel pipe protection enclosure con-struction,so as to provide some new idea for the design of foundation consolidation scheme.