全回转套管机%钻孔灌注桩%拔桩%桩孔回填
全迴轉套管機%鑽孔灌註樁%拔樁%樁孔迴填
전회전투관궤%찬공관주장%발장%장공회전
rotary machine%bored pile%pile pulling%pile-hole backfill
为保证盾构的顺利推进,需对既有护管桥钻孔灌注桩进行拔除处理,针对工程地质条件差且附近的大直径合流污水管对土体变形非常敏感的特点,选用360°全回转套管机进行拔桩施工,并从施工难点、工艺比选、施工过程等方面进行了阐述,为类似工程施工积累了经验。
為保證盾構的順利推進,需對既有護管橋鑽孔灌註樁進行拔除處理,針對工程地質條件差且附近的大直徑閤流汙水管對土體變形非常敏感的特點,選用360°全迴轉套管機進行拔樁施工,併從施工難點、工藝比選、施工過程等方麵進行瞭闡述,為類似工程施工積纍瞭經驗。
위보증순구적순리추진,수대기유호관교찬공관주장진행발제처리,침대공정지질조건차차부근적대직경합류오수관대토체변형비상민감적특점,선용360°전회전투관궤진행발장시공,병종시공난점、공예비선、시공과정등방면진행료천술,위유사공정시공적루료경험。
In order to guarantee successful shield construction, the paper carries out bored pile pulling treatment of existing pipe-protecting bridge. According to bad engineering geology conditions and being sensitive to soil deformation of large-diameter drainage pipe, it selects 360°ro-tary machine for pile-pulling construction, and describes construction difficulties, technology comparison and construction process, which has ac-cumulated experience for similar engineering construction.