静压法%PHC管桩%粉砂夹层%沉桩困难
靜壓法%PHC管樁%粉砂夾層%沉樁睏難
정압법%PHC관장%분사협층%침장곤난
Static pressure method%Prestressed high strength concrete pile%Silty sand dissection%Settlement difficulties of pile
为解决在较厚粉砂夹层及硬层等特殊地质条件下应用静压法沉桩会出现爆桩、沉桩困难等问题,结合工程实例,提出了三种解决方案。通过对技术、经济、工期进行对比论证得出,提高管桩桩身抗压承载力的方式为最优选择。经检测,管桩各项技术指标均满足设计要求。
為解決在較厚粉砂夾層及硬層等特殊地質條件下應用靜壓法沉樁會齣現爆樁、沉樁睏難等問題,結閤工程實例,提齣瞭三種解決方案。通過對技術、經濟、工期進行對比論證得齣,提高管樁樁身抗壓承載力的方式為最優選擇。經檢測,管樁各項技術指標均滿足設計要求。
위해결재교후분사협층급경층등특수지질조건하응용정압법침장회출현폭장、침장곤난등문제,결합공정실례,제출료삼충해결방안。통과대기술、경제、공기진행대비론증득출,제고관장장신항압승재력적방식위최우선택。경검측,관장각항기술지표균만족설계요구。
It occurs blasting piles, settlement difficulties of pile or other issues on special geological conditions of thick silty sand dissection and hard formation by using the static pressure method. According to the problems motioned above, three kinds of solutions are put forward combined with engineering examples. Through contrastive demonstrating of the technology, economy and progress, it can be drawn that the method of strengthen the pipe in order to improve the compression bearing capacity of the pile body is the best choice. And the test results show that the piles can meet the design requirements of the technical indicators.