桃花港段长江岸线综合整治工程位于长江下游江阴水道进口段南岸,岸线建有大量的石油、化工码头。此段水面开阔,滩地芦苇丛生,岸线呈内凹的平面形态,泥沙易于落淤,不利于码头前沿水深及河势稳定。采用潮汐河工模型试验与二维水流潮汐数学模型计算相结合的方法,研究3个不同岸线整治工程方案对河段河势的影响。通过研究认为:不同方案工程兴建后,对工程上下游河段水位、河道主流区流速场及禄安洲分流比影响均较小。工程局部区域的流态发生了明显的变化,原滩地范围内的回流消失,工程外侧水流趋于平顺。从综合整治效果来看,推荐方案(方案3)增加了码头前沿及后方的疏浚工程,既能满足岸线平顺的需要,也能满足该段深水岸线开发利用需求,对地方社会经济发展更加有利。
桃花港段長江岸線綜閤整治工程位于長江下遊江陰水道進口段南岸,岸線建有大量的石油、化工碼頭。此段水麵開闊,灘地蘆葦叢生,岸線呈內凹的平麵形態,泥沙易于落淤,不利于碼頭前沿水深及河勢穩定。採用潮汐河工模型試驗與二維水流潮汐數學模型計算相結閤的方法,研究3箇不同岸線整治工程方案對河段河勢的影響。通過研究認為:不同方案工程興建後,對工程上下遊河段水位、河道主流區流速場及祿安洲分流比影響均較小。工程跼部區域的流態髮生瞭明顯的變化,原灘地範圍內的迴流消失,工程外側水流趨于平順。從綜閤整治效果來看,推薦方案(方案3)增加瞭碼頭前沿及後方的疏浚工程,既能滿足岸線平順的需要,也能滿足該段深水岸線開髮利用需求,對地方社會經濟髮展更加有利。
도화항단장강안선종합정치공정위우장강하유강음수도진구단남안,안선건유대량적석유、화공마두。차단수면개활,탄지호위총생,안선정내요적평면형태,니사역우락어,불리우마두전연수심급하세은정。채용조석하공모형시험여이유수류조석수학모형계산상결합적방법,연구3개불동안선정치공정방안대하단하세적영향。통과연구인위:불동방안공정흥건후,대공정상하유하단수위、하도주류구류속장급록안주분류비영향균교소。공정국부구역적류태발생료명현적변화,원탄지범위내적회류소실,공정외측수류추우평순。종종합정치효과래간,추천방안(방안3)증가료마두전연급후방적소준공정,기능만족안선평순적수요,야능만족해단심수안선개발이용수구,대지방사회경제발전경가유리。
The TaohuaPort section regulation project of the Yangtze River is located in the lower Yangtze river , south bank of the Jiangyin channel inlet section . Along with a lot of oil and chemical wharfs , this section is Open water and fully -grow with reeds . The coastline is a concave shape , and the sediment is prone to deposition , which is not conducive to the stability of wharf apron and river regime . Combining with tidal river model test and two -dimensional mathematical model of tidal currents method , three different regulation projects for the influence of river regime are researched in the article . Through research that different scheme of engineering construction has little influence on the water level and flow field of upstream and downstream , and the split ratio of Luan Island is stability . The flow patterns which near the engineering areas has changed significantly , the recirculation of the original beach disappeared , the outer mainstream tends to straight . Comprehensive comparation from the regulation effect , recommended program (Option III ) increased the dredging engineering which near the the wharfs , to meet both the needs of smooth coastline and improve deepwater coastline development , which bring more favorable to the utilization of local social and economic development .