通过对某剧场舞台结构的检测鉴定及分析,根据工艺要求,提出了电动吊杆改造方案,并对结构进行了安全性评定。同时提出了结构设计和施工的方案,可为类似工程参考。
通過對某劇場舞檯結構的檢測鑒定及分析,根據工藝要求,提齣瞭電動弔桿改造方案,併對結構進行瞭安全性評定。同時提齣瞭結構設計和施工的方案,可為類似工程參攷。
통과대모극장무태결구적검측감정급분석,근거공예요구,제출료전동조간개조방안,병대결구진행료안전성평정。동시제출료결구설계화시공적방안,가위유사공정삼고。
Based on detections and analyses on the structure of the theatre stage of one company and according to the re -quirements of the technologies ,the reconstruction programs for the electric boom are put forward and safety evaluations on the structure are conducted .Meanwhile programs for structure design and construction are also raised ,which can provide references for the same kind of projects .